My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Veregy
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Veregy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:14:07 PM
Creation date
5/28/2024 3:13:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend, IN – Department of Public Works <br />RFQ Response: Guaranteed Energy Savings Contract <br /> Page | 10 <br />Project Management Approach <br />Veregy Project Managers (PM) are active in the project from its conception. They work with <br />project developers through the audit and design phase, and then after the project is approved, <br />they take control through the implementation and the entire warranty period. Veregy project <br />managers are field-tested professionals with engineering and business backgrounds with the <br />industry knowledge to be involved in every project phase. Veregy promotes an interactive <br />working relationship with our clients. We will work with the City of South Bend to integrate our <br />staff of professionals with the city’s team of personnel and subcontractors so that every aspect <br />of the project is successfully coordinated. <br /> <br /> <br />CONTRACTOR & EQUIPMENT SELECTION <br />Contractor Selection <br />Veregy provides over $200 million annually in guaranteed energy projects, contractor services <br />and energy services. With this volume of work, we have developed solid, fiscally responsible <br />standard practices and methods to select contractors. Some of the things that we analyze when <br />selecting a contractor are: <br />• Financial stability <br />• Available capacity for project <br />• Historical project performance <br />• Proximity to project <br />• Safety record <br />• Similar attitudes toward quality <br />• Legal history <br /> <br />Equipment Selection <br />Equipment selection follows a similar process as contractor selection. With over $200 million <br />dollars in annual projects, Veregy has the buying power to assure the best pricing on all <br />equipment. Some of the things that we analyze when selecting equipment are:
The URL can be used to link to this page
Your browser does not support the video tag.