My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Veregy
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Veregy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 3:14:07 PM
Creation date
5/28/2024 3:13:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Show annotations
View images
View plain text
City of South Bend, IN – Department of Public Works <br />RFQ Response: Guaranteed Energy Savings Contract <br /> Page | 9 <br />Administration and Laboratory Building <br />Veregy recommends installing solar on most of the <br />roofing area to maximize the amount of carbon <br />offset in the most economical method. The solar <br />produced electricity will also provide a positive cash <br />flow by offsetting purchases from the utility for the <br />energy consumed at Administration Building. <br /> <br />After the maximum amount of solar was placed on <br />the roof, the design was optimized. The projected <br />electric generation from this was compared to the <br />present consumption. The table above summarizes <br />our findings, and the layout for the array can be <br />found to the right. Further information about the <br />design can be found in the Appendix. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Administration / Laboratory Building <br /> <br />HVAC Measures <br />Veregy engineers inspected all the facilities at the WWTP and found most of the HVAC systems <br />to be in good working order. It is our recommendation to replace a 7.5-ton ACCU, building <br />controls, and recommission existing systems in the headworks building. Replace building <br />controls and recommission existing systems in the administration building. Replace a window <br />air conditioning unit in the dewatering building with a central AC system and repair the window <br />where unit is removed. <br /> <br />LED Lighting <br />Our lighting engineer walked all the facility and found 392 light fixtures that we recommend be <br />upgraded to LED. This scope of work will realize a quick payback in savings and, coupled with <br />a rebate from the utility, will provide a great return on investment. <br /> <br />Administration / Laboratory Building <br />3113 Riverside Drive, South Bend, IN <br />Solar Array Size 60 kW AC <br />Annual Electric <br />Production <br />88 MWh <br />Existing Annual <br />Consumption <br />217 MWh <br />Portion Offset by Solar 28%
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).