DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907 <br />M&V Approach for ECM 6 - Boiler Upgrades <br />Option A (key parameter measurement) will be <br />M&V Plan Description: <br />used to quantify the energy savings associated <br />with this ECM. <br />• Key parameters for the existing boiler <br />performance is combustion efficiency, as well as <br />Baseline Performance <br />facility operating hours & zone temperature <br />setpoint schedules, heating plant efficiencies and <br />Parameters: <br />site weather data. <br />• All baseline performance parameters are set forth <br />in calculations included in the appendix. <br />• All post -installation performance parameters are <br />set forth in calculations included in the appendix. <br />Post Installation <br />• Facility operating hours, envelope UA value and <br />Performance Parameters: <br />weather data will be the same as the baseline <br />performance parameters. <br />• The boiler efficiency will be measured post install. <br />• Confirm ECM was installed as stated in the scope <br />Performance Assurance <br />of work and is performing as specified prior to <br />Activities (Construction <br />acceptance. <br />Period): <br />. Include findings in Post Installation Report <br />generated after completion of installation of <br />project. <br />• No ongoing measurements involved with this <br />ECM. <br />• Quarterly site visits to all Customer facilities <br />Performance Assurance <br />impacted by EPC project. <br />Activities (Year 1): <br />. This performance -period inspection will occur one <br />time. <br />• Calculate energy savings achieved during the first <br />Guarantee Year <br />• Include findings in annual M&V Report. <br />• No ongoing measurements involved with this <br />Performance Assurance <br />ECM. <br />Activities (Year 2-3): <br />• Carry forward PIR findings in Years 2,3 annual <br />M&V Reports. <br />EPC Schedule D, Rev 7-2017 Page 7 of 17 <br />