Laserfiche WebLink
EPC Schedule D, Rev 7-2017 Page 6 of 17 <br />M&V Approach for ECM 5 – RTU Upgrades <br />M&V Plan Description: <br />Option S (agreed upon savings that have been <br />derived through engineering calculations) will be <br />used to quantify the energy savings associated <br />with this ECM. <br />Baseline Performance <br />Parameters: <br />x Key parameters for the RTU savings include <br />building envelope characteristics, facility operating <br />hours & zone temperature setpoint schedules, <br />existing RTU efficiencies and site weather data. <br />x All baseline performance parameters are set forth <br />in calculations included in the appendix. <br />Post Installation <br />Performance Parameters: <br />x All post-installation performance parameters are <br />set forth in calculations included in the appendix. <br />x Nameplate efficiency of new RTU. <br />Performance Assurance <br />Activities (Construction <br />Period): <br />x Confirm ECM was installed as stated in the scope <br />of work and is performing as specified prior to <br />acceptance. <br />x Include findings in Post Installation Report <br />generated after completion of installation of <br />project. <br />Performance Assurance <br />Activities (Year 1): <br />x No ongoing measurements involved with this <br />ECM. <br />x Quarterly site visits to all Customer facilities <br />impacted by EPC project. <br />x Include Post Installation Report findings in annual <br />M&V Report. <br />Performance Assurance <br />Activities (Year 2-3): <br />x No ongoing measurements involved with this <br />ECM. <br />x Carry forward Post Installation Report findings in <br />annual M&V Report. <br /> <br /> <br />DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907