My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Opening of Quotations/Proposals
>
Opening of Proposals - WWTP Solar Guaranteed Energy Savings Contract Proj. No. 124-015 - Ameresco
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 2:51:56 PM
Creation date
5/28/2024 3:12:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907 <br />M&V Approach for ECM 8 - Interior and Exterior Lighting Upgrades <br />Option A (key parameter measurement) will be used to <br />M&V Plan Description: <br />quantify the energy savings associated with this ECM. <br />• Key parameters include exiting fixture quantities wattages <br />Baseline Performance <br />Parameters: <br />hours of operation (burn hours). <br />• All baseline performance parameters are set forth in <br />calculations included in the appendix. <br />• All post -installation performance parameters are set forth in <br />Post Installation <br />calculations included in the appendix. <br />Performance Parameters: <br />• New fixture and retrofit wattages, hours of operation. <br />• Confirm ECM was installed as stated in the scope of work and is <br />performing as specified prior to acceptance. <br />• Sample (80/20 statistical criteria)) of pre and post wattage <br />Performance Assurance <br />Activities (Construction <br />Period): <br />readings on affected lighting systems. <br />• Confirm as -built quantities. <br />• Include findings in Post Installation Report generated after <br />completion of installation of project. <br />• Calculate energy savings achieved with final as -built counts, <br />pre -post kW readings. <br />• No ongoing measurements involved with this ECM. <br />Performance Assurance <br />Activities (Year 1): <br />• Quarterly site visits to all Customer facilities impacted by EPC <br />project. <br />• Include construction period findings in annual M&V Report. <br />Performance Assurance <br />Activities (Year 2-3): <br />• No ongoing measurements involved with this ECM. <br />• Include construction period findings in annual M&V Report. <br />ACB Always On - no controls <br />8423 <br />ACB Bu E e <br />7 <br />ACB Conference / Meeting <br />1553 <br />ACB Exit Signs <br />8760 <br />ACB Exterior <br />4380 <br />ACB Hallway <br />2250 <br />Hours of operation used <br />in calculations <br />ACB Multi -Purpose <br />2250 <br />ACB Office Private <br />1758 <br />ACB Office Open <br />1758 <br />ACB Restroom multiple <br />2250 <br />ACB Restroom (single) <br />2250 <br />ACB Seasonal <br />3000 <br />ACB Storage <br />500 <br />Cit Hall Always left on <br />8760 <br />Cit Hall Always On - no controls <br />8760 <br />Cit Hall Exterior <br />4380 <br />EPC Schedule D, Rev 7-2017 Page 8 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.