Laserfiche WebLink
EPC Schedule D, Rev 7-2017 Page 5 of 17 <br />M&V Approach for ECM 4 – Cooling Upgrades <br />M&V Plan Description: <br />Option A* (agreed upon savings that have been <br />derived through engineering calculations) will be <br />used to quantify the energy savings associated <br />with this ECM. <br />Baseline Performance <br />Parameters: <br />x Key parameters include building existing system <br />efficiencies, facility operating hours & zone <br />temperature setpoint schedules and site weather <br />data. <br />x All baseline performance parameters are set forth <br />in calculations included in the appendix. <br />Post Installation <br />Performance Parameters: <br />x All post-installation performance parameters are <br />set forth in calculations included in the appendix. <br />x New equipment efficiencies, new operating hours <br />for added chilled water pumps. Facility operating <br />hours, zone temp and setpoint schedules and <br />weather data will be the same as the baseline <br />performance parameters. <br /> <br />Performance Assurance <br />Activities (Construction <br />Period): <br />x Confirm ECM was installed as stated in the scope <br />of work and is performing as specified prior to <br />acceptance. <br />x Include findings in Post Installation Report <br />generated after completion of installation of <br />project. <br />Performance Assurance <br />Activities (Year 1): <br />x No ongoing measurements involved with this <br />ECM. <br />x Quarterly site visits to all Customer facilities <br />impacted by EPC project. <br />x Confirm sequencing of new CHW plant is <br />consistent with design intent. <br />x Calculate energy savings achieved during the first <br />Guarantee Year. <br />x Include findings in annual M&V Report. <br />Performance Assurance <br />Activities (Year 2-3): <br />x No ongoing measurements involved with this <br />ECM. <br />x Include findings in annual M&V Report. <br /> <br /> <br />DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907