Laserfiche WebLink
DocuSign Envelope ID: A95174CF-47BB-49A8-9A31-757C478FB907 <br />M&V Approach for ECM 4 - Cooling Upgrades <br />Option A* (agreed upon savings that have been <br />M&V Plan Description: <br />derived through engineering calculations) will be <br />used to quantify the energy savings associated <br />with this ECM. <br />• Key parameters include building existing system <br />efficiencies, facility operating hours & zone <br />Baseline Performance <br />temperature setpoint schedules and site weather <br />Parameters: <br />data. <br />• All baseline performance parameters are set forth <br />in calculations included in the appendix. <br />• All post -installation performance parameters are <br />set forth in calculations included in the appendix. <br />• New equipment efficiencies, new operating hours <br />Post Installation <br />for added chilled water pumps. Facility operating <br />Performance Parameters: <br />hours, zone temp and setpoint schedules and <br />weather data will be the same as the baseline <br />performance parameters. <br />• Confirm ECM was installed as stated in the scope <br />Performance Assurance <br />of work and is performing as specified prior to <br />Activities (Construction <br />acceptance. <br />Period): <br />• Include findings in Post Installation Report <br />generated after completion of installation of <br />project. <br />• No ongoing measurements involved with this <br />ECM. <br />• Quarterly site visits to all Customer facilities <br />Performance Assurance <br />impacted by EPC project. <br />Activities (Year 1): <br />• Confirm sequencing of new CHW plant is <br />consistent with design intent. <br />• Calculate energy savings achieved during the first <br />Guarantee Year. <br />• Include findings in annual M&V Report. <br />Performance Assurance <br />• No ongoing measurements involved with this <br />Activities (Year 2-3): <br />ECM. <br />• Include findings in annual M&V Report. <br />EPC Schedule D, Rev 7-2017 Page 5 of 17 <br />