My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
sbend
>
Public
>
Public Works
>
City of South Bend Construction Standards & Specifications
>
10.26.2021-SBN-Standards-Manufacturer-Additions-Minor-Revisions-final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2024 3:44:43 PM
Creation date
5/6/2024 3:43:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
City Property
Document Date
5/6/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />3A <br />4 <br />2 <br />4 <br />4"-6" <br />3"-5" <br />12"6"6" <br />3B <br />6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />EROSION CONTROL BLANKET 7-7 <br />7-1, 7-2 <br />June 26, 2018 <br />SECTION 7 - EARTHWORK & EROSION AND SEDIMENT CONTROL <br />SLOPE INSTALLATION: <br />1. Prepare soil before installing blankets, including any necessary application of lime, <br />fertilizer, and seed. <br />2. Begin at the top of the slope by anchoring the blanket in a 6" deep x 6" wide trench <br />with approximately 12" of blanket extended beyond the up-slope portion of the trench. <br />Anchor the blanket with a row of staples/stakes approximately 12" apart in the bottom <br />of the trench. Backfill and compact the trench after stapling. Apply seed to compacted <br />soil and fold remaining 12" portion of blanket back over seed and compacted soil. <br />Secure blanket over compacted soil with a row of staples/stakes spaced approximately <br />12" apart across the width of the blanket. <br />3. Roll the blankets (A) down or (B) horizontally across the slope. Blankets will unroll with <br />appropriate side against the soil surface. All blankets must be securely fastened to soil <br />surface by placing staples/stakes in appropriate locations as per by manufacturer's <br />recommendation. <br />4. The edges of parallel blankets must be stapled with approximately 3"-5" overlap. To <br />ensure proper seam alignment, place the edge of the overlapping blanket (blanket <br />being installed on top) even with the colored seam stitch on the previously installed <br />blanket. <br />5. Splicing consecutive blankets down the slope shall be done in a shingle style with the <br />up-slope blanket overlapping the down-slope blanket 3" minimum. Staple through <br />overlapped area, approximately 12" apart across entire blanket width. <br />6. In loose soil conditions the use of staple or stake lengths greater than 6" may be <br />necessary to properly secure the blankets. <br />GENERAL NOTES: <br />1. Install erosion control blanket to prevent erosion on slopes 3:1 or steeper, as well as <br />other areas prone to erosion, to aid in establishing vegetation and preventing soil <br />movement. <br />2. Installation instructions above are provided for reference only. Installation should be <br />completed in accordance with erosion control blanket manufacturer's specifications. <br />3. Model and manufacturer to be selected based on project slopes, vegetation, and soil <br />conditions.
The URL can be used to link to this page
Your browser does not support the video tag.