Laserfiche WebLink
TS ECBor <br />TS ECBor <br />TS <br />ECB <br />or <br />TS <br />ECB <br />or House <br />Garage <br />Street <br />Sidewalk <br />SFSFSFSFSFSF SF SF <br />SFSFSF>>>>>>>>>>6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />TYPICAL INDIVIDUAL LOT EROSION AND <br />SEDIMENT CONTROL MEASURES (LESS THAN 1-ACRE)7-8 <br />7-1, 7-2 <br />June 26, 2018 <br />SECTION 7 - EARTHWORK & EROSION AND SEDIMENT CONTROL <br />Property Lines <br />Constructed Building Pad <br />Silt Fence or Filter Sock <br />Stream/Ditch <br />Gravel Construction Entrance <br />Soil Stockpile Protection <br />Inlet Protection <br />Temporary Seeding <br />Erosion Control Blanket <br />SF <br />>TS <br />ECB <br />NOTES: <br />1.Erosion control measures must be functional and maintained throughout <br />construction. <br />2.Erosion Control Blanket shall be used on slopes greater than 3:1 per Std. 7-7. <br />3.Install Silt Fence or Filter Sock as necessary according to Std. 7-4 and 7-5. <br />4.Post Notice of Intent and place rain gauge on site prior to start of construction. <br />5.Remove sediment from street at the end of each work day. Do not flush bulk <br />sediments with water. <br />LEGEND