Laserfiche WebLink
10' Min.Varies Per Site Layout10 Mil Plastic Lining (Typ.) <br />Stake (Typ.) <br />Straw Bale (Typ.) <br />Staples (2 per Bale) <br />1 8" Dia. Steel Wire in U 2"x4" <br />Binding Wire <br />Straw Bale <br />10 Mil Plastic Lining <br />Wood or Metal Stakes (2 per Bale) <br />PLAN <br />SECTION <br />6/26/18 <br />CITY OF SOUTH BENDItemRevision <br />STANDARD <br />EFFECTIVE DATE: <br />REF STD SPEC SEC <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />Kara M. Boyles, Ph.D., P.E. Date <br />CONCRETE WASHOUT 7-6 <br />7-1, 7-2 <br />June 26, 2018 <br />SECTION 7 - EARTHWORK & EROSION AND SEDIMENT CONTROL <br />NOTES: <br />1. Install concrete washout sign within 30' of temporary washout facility. <br />2. Layout of washout facility may vary depending on space available within construction <br />staging area. Washout facilities shall be designated by the permit holder before work <br />begins and shall be located in an appropriate area where the waste resulting from the <br />washout cannot enter sewer systems or local waterways. <br />3. Waste from the washout facilities shall be disposed of in an approved manner <br />according to state laws.