Laserfiche WebLink
SOUTH BEND 2024 COMMUNITY CROSSINGS - BENDIX DRIVE <br />CITY OF SOUTH BEND PROJECT NUMBER: 124-006 <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering <br />Bid Date: 3/26/2024 <br />Page 1 of 1 <br />Base Bids Total <br />$733,260.00 <br />$514,700.00 <br />$539,403.02 <br />Amount Over <br />$0.00 <br />$0.00 <br />Amount Under <br />$218,560.00 <br />$193,856.98 <br />°/ Over <br />0.0% <br />0.0% <br />• Under <br />29.8% <br />26.4% <br />Engineer's Estimate <br />Milestone Contractors, L.P. <br />Reith Riley Construction Co, Inc. <br />DIVISION 3 - BENDIX DRIVE (FROM <br />S. WESTMOOR STREET TO ECLIPSE <br />PLACE) <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />1 <br />HMA Surface, T e B <br />1176 <br />TON <br />$116.00 <br />$136,416.00 <br />$82.00 <br />$96,432.00 <br />$91.00 <br />$107,016.00 <br />2 <br />HMA Intermediate, Type B <br />1961 <br />TON <br />$98.00 <br />$192,178.00 <br />$69.00 <br />$135,309.00 <br />$72.75 <br />$142,662.75 <br />3 <br />Milling, Asphalt, 4 IN. <br />14258 <br />SYS <br />$5.00 <br />$71,290.00 <br />$4.00 <br />$57,032.00 <br />$3.83 <br />$54,608.14 <br />4 <br />HMA for Patching, Full Depth, Type B <br />24 <br />TON <br />$290.00 <br />$6,960.00 <br />$180.00 <br />$4,320.00 <br />$91.00 <br />$2,184.00 <br />5 <br />Asphalt for Tack Coat <br />5 <br />TON <br />$700.00 <br />$3,500.00 <br />$1.00 <br />$5.00 <br />$650.00 <br />$3,250.00 <br />6 <br />Joint Adhesive, Surface <br />2293 <br />LFT <br />$1.00 <br />$2,293.00 <br />$0.01 <br />$22.93 <br />$0.60 <br />$1,375.80 <br />7 <br />Joint Adhesive, Intermediate <br />2293 <br />LFT <br />$1.00 <br />$2,293.00 <br />$0.01 <br />$22.93 <br />$0.65 <br />$1,490.45 <br />8 <br />Sidewalk, Concrete <br />54 <br />SYS <br />$118.00 <br />$6,372.00 <br />$131.00 <br />$7,074.00 <br />$142.00 <br />$7,668.00 <br />9 <br />Curb Ramp, Concrete <br />31 <br />SYS <br />$300.00 <br />$9,300.00 <br />$280.00 <br />$8,680.00 <br />$340.00 <br />$10,540.00 <br />48 <br />325 <br />SYS <br />$0:00 <br />$0 00 <br />$0 90 <br />$0 00 <br />$0 90 <br />$0 00 <br />11 <br />Curb, Concrete <br />1435 <br />LFT <br />$90.00 <br />$129,150.00 <br />$69.00 <br />$99,015.00 <br />$67.60 <br />$97,006.00 <br />12 <br />Line, Thermoplastic, Solid, Yellow, 4 IN. <br />2930 <br />LFT <br />$3.00 <br />$8,790.00 <br />$0.75 <br />$2,197.50 <br />$0.58 <br />$1,699.40 <br />13 <br />Line, Thermoplastic, Solid, White, 4 IN. <br />4020 <br />LFT <br />$2.00 <br />$8,040.00 <br />$0.75 <br />$3,015.00 <br />$0.58 <br />$2,331.60 <br />14 <br />Transverse Marking, Thermoplastic, Stop Line, 24 IN. <br />72 <br />LFT <br />$25.00 <br />$1,800.00 <br />$15.00 <br />$1,080.00 <br />$13.07 <br />$941.04 <br />15 <br />Transverse Marking, Thermoplastic, Crosswalk Line, White, 6 IN. <br />450 <br />LFT <br />$7.00 <br />$3,150.00 <br />$5.00 <br />$2,250.00 <br />$2.24 <br />$1,008.00 <br />16 <br />Pavement Message Marking, Thermoplastic, Lane Indication Arrow <br />3 <br />EA <br />$250.00 <br />$750.00 <br />$200.00 <br />$600.00 <br />$203.00 <br />$609.00 <br />17 <br />Pavement Message Marking, Thermoplastic, Bicycle and Arrow Symbol <br />17 <br />EA <br />$301.00 <br />$5,117.00 <br />$400.00 <br />$6,800.00 <br />$607.00 <br />$10,319.00 <br />18 <br />Grooving for Pavement Markings <br />6950 <br />LFT <br />$2.00 <br />$13,900.00 <br />$1.25 <br />$8,687.50 <br />$0.52 <br />$3,614.00 <br />19 <br />Detector Housing, Replace <br />1 <br />EA <br />$301.00 <br />$301.00 <br />$1,700.00 <br />$1,700.00 <br />$1,700.00 <br />$1,700.00 <br />20 <br />Signal Pole, Pedestal, 12 FT. <br />4 <br />EA <br />$1,250.00 <br />$5,000.00 <br />$1,400.00 <br />$5,600.00 <br />$1,400.00 <br />$5,600.00 <br />21 <br />Signal Pole Foundation <br />4 <br />EA <br />$1,750.00 <br />$7,000.00 <br />$1,100.00 <br />$4,400.00 <br />$1,100.00 <br />$4,400.00 <br />22 <br />Pedestrian Signal Head, Countdown, 18 IN. <br />4 <br />EA <br />$1,100.00 <br />$4,400.00 <br />$819.00 <br />$3,276.00 <br />$819.00 <br />$3,276.00 <br />23 <br />Pedestrian Push Button, APS <br />12 <br />EA <br />$1,450.00 <br />$17,400.00 <br />$1,600.00 <br />$19,200.00 <br />$1,600.00 <br />$19,200.00 <br />24 <br />Conduit, HDPE SCH. 80, 2 IN. <br />300 <br />LFT <br />$38.00 <br />$11,400.00 <br />$32.00 <br />$9,600.00 <br />$32.00 <br />$9,600.00 <br />25 <br />Conduit, PVC SCH. 40, 2 IN. <br />100 <br />LFT <br />$28.00 <br />$2,800.00 <br />$17.00 <br />$1,700.00 <br />$17.00 <br />$1,700.00 <br />26 <br />Signal Cable, Control, Copper, 5C/14 GA <br />300 <br />LFT <br />$5.00 <br />$1,500.00 <br />$4.50 <br />$1,350.00 <br />$4.50 <br />$1,350.00 <br />27 <br />Handhole, Adjust to Grade <br />2 <br />1 EA <br />$1,100.00 <br />$2,200.00 <br />$400.00 <br />$800.00 <br />$400.00 <br />$800.00 <br />28 <br />Manhole, Structure Adjustment <br />3 <br />EA <br />$200.00 <br />$600.00 <br />$940.00 <br />$2,820.00 <br />$531.00 <br />$1,593.00 <br />29 <br />Inlet, Structure Adjustment <br />2 <br />EA <br />$200.00 <br />$400.00 <br />$940.00 <br />$1,880.00 <br />$531.00 <br />$1,062.00 <br />30 <br />lWater Valve, Structure Adjustment <br />4 <br />EA <br />$100.00 <br />$400.00 <br />$65.00 <br />$260.00 <br />$350.00 <br />$1,400.00 <br />31 <br />Maintenance of Traffic <br />1 <br />LS <br />$45,830.00 <br />$45,830.00 <br />$13,171.14 <br />$13,171.14 <br />$16,619.72 <br />$16,619.72 <br />32 <br />IMobilization and Demobilization <br />1 <br />LS <br />$32,730.00 <br />$32,730.00 <br />$16,400.00 <br />$16,400.00 <br />$22,779.12 <br />$22,779.12 <br />TOTAL BASE BID <br />$733,260.00 <br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. <br />'if..' - - Z'e - <br />Nitin Timble, P.E. <br />Date: 3/27/2024 <br />$514,700.00 <br />Z' r/ <br />i 2•�f,\57fp�c�F 4j� <br />N0. <br />' 10707587 <br />$539,403.02 <br />