SOUTH BEND 2024 COMMUNITY CROSSINGS - BENDIX DRIVE
<br />CITY OF SOUTH BEND PROJECT NUMBER: 124-006
<br />BID TABULATION SHEET
<br />Prepared by: A&Z Engineering
<br />Bid Date: 3/26/2024
<br />Page 1 of 1
<br />Base Bids Total
<br />$733,260.00
<br />$514,700.00
<br />$539,403.02
<br />Amount Over
<br />$0.00
<br />$0.00
<br />Amount Under
<br />$218,560.00
<br />$193,856.98
<br />°/ Over
<br />0.0%
<br />0.0%
<br />• Under
<br />29.8%
<br />26.4%
<br />Engineer's Estimate
<br />Milestone Contractors, L.P.
<br />Reith Riley Construction Co, Inc.
<br />DIVISION 3 - BENDIX DRIVE (FROM
<br />S. WESTMOOR STREET TO ECLIPSE
<br />PLACE)
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Extension
<br />Unit Price
<br />Extension
<br />Unit Price
<br />Extension
<br />1
<br />HMA Surface, T e B
<br />1176
<br />TON
<br />$116.00
<br />$136,416.00
<br />$82.00
<br />$96,432.00
<br />$91.00
<br />$107,016.00
<br />2
<br />HMA Intermediate, Type B
<br />1961
<br />TON
<br />$98.00
<br />$192,178.00
<br />$69.00
<br />$135,309.00
<br />$72.75
<br />$142,662.75
<br />3
<br />Milling, Asphalt, 4 IN.
<br />14258
<br />SYS
<br />$5.00
<br />$71,290.00
<br />$4.00
<br />$57,032.00
<br />$3.83
<br />$54,608.14
<br />4
<br />HMA for Patching, Full Depth, Type B
<br />24
<br />TON
<br />$290.00
<br />$6,960.00
<br />$180.00
<br />$4,320.00
<br />$91.00
<br />$2,184.00
<br />5
<br />Asphalt for Tack Coat
<br />5
<br />TON
<br />$700.00
<br />$3,500.00
<br />$1.00
<br />$5.00
<br />$650.00
<br />$3,250.00
<br />6
<br />Joint Adhesive, Surface
<br />2293
<br />LFT
<br />$1.00
<br />$2,293.00
<br />$0.01
<br />$22.93
<br />$0.60
<br />$1,375.80
<br />7
<br />Joint Adhesive, Intermediate
<br />2293
<br />LFT
<br />$1.00
<br />$2,293.00
<br />$0.01
<br />$22.93
<br />$0.65
<br />$1,490.45
<br />8
<br />Sidewalk, Concrete
<br />54
<br />SYS
<br />$118.00
<br />$6,372.00
<br />$131.00
<br />$7,074.00
<br />$142.00
<br />$7,668.00
<br />9
<br />Curb Ramp, Concrete
<br />31
<br />SYS
<br />$300.00
<br />$9,300.00
<br />$280.00
<br />$8,680.00
<br />$340.00
<br />$10,540.00
<br />48
<br />325
<br />SYS
<br />$0:00
<br />$0 00
<br />$0 90
<br />$0 00
<br />$0 90
<br />$0 00
<br />11
<br />Curb, Concrete
<br />1435
<br />LFT
<br />$90.00
<br />$129,150.00
<br />$69.00
<br />$99,015.00
<br />$67.60
<br />$97,006.00
<br />12
<br />Line, Thermoplastic, Solid, Yellow, 4 IN.
<br />2930
<br />LFT
<br />$3.00
<br />$8,790.00
<br />$0.75
<br />$2,197.50
<br />$0.58
<br />$1,699.40
<br />13
<br />Line, Thermoplastic, Solid, White, 4 IN.
<br />4020
<br />LFT
<br />$2.00
<br />$8,040.00
<br />$0.75
<br />$3,015.00
<br />$0.58
<br />$2,331.60
<br />14
<br />Transverse Marking, Thermoplastic, Stop Line, 24 IN.
<br />72
<br />LFT
<br />$25.00
<br />$1,800.00
<br />$15.00
<br />$1,080.00
<br />$13.07
<br />$941.04
<br />15
<br />Transverse Marking, Thermoplastic, Crosswalk Line, White, 6 IN.
<br />450
<br />LFT
<br />$7.00
<br />$3,150.00
<br />$5.00
<br />$2,250.00
<br />$2.24
<br />$1,008.00
<br />16
<br />Pavement Message Marking, Thermoplastic, Lane Indication Arrow
<br />3
<br />EA
<br />$250.00
<br />$750.00
<br />$200.00
<br />$600.00
<br />$203.00
<br />$609.00
<br />17
<br />Pavement Message Marking, Thermoplastic, Bicycle and Arrow Symbol
<br />17
<br />EA
<br />$301.00
<br />$5,117.00
<br />$400.00
<br />$6,800.00
<br />$607.00
<br />$10,319.00
<br />18
<br />Grooving for Pavement Markings
<br />6950
<br />LFT
<br />$2.00
<br />$13,900.00
<br />$1.25
<br />$8,687.50
<br />$0.52
<br />$3,614.00
<br />19
<br />Detector Housing, Replace
<br />1
<br />EA
<br />$301.00
<br />$301.00
<br />$1,700.00
<br />$1,700.00
<br />$1,700.00
<br />$1,700.00
<br />20
<br />Signal Pole, Pedestal, 12 FT.
<br />4
<br />EA
<br />$1,250.00
<br />$5,000.00
<br />$1,400.00
<br />$5,600.00
<br />$1,400.00
<br />$5,600.00
<br />21
<br />Signal Pole Foundation
<br />4
<br />EA
<br />$1,750.00
<br />$7,000.00
<br />$1,100.00
<br />$4,400.00
<br />$1,100.00
<br />$4,400.00
<br />22
<br />Pedestrian Signal Head, Countdown, 18 IN.
<br />4
<br />EA
<br />$1,100.00
<br />$4,400.00
<br />$819.00
<br />$3,276.00
<br />$819.00
<br />$3,276.00
<br />23
<br />Pedestrian Push Button, APS
<br />12
<br />EA
<br />$1,450.00
<br />$17,400.00
<br />$1,600.00
<br />$19,200.00
<br />$1,600.00
<br />$19,200.00
<br />24
<br />Conduit, HDPE SCH. 80, 2 IN.
<br />300
<br />LFT
<br />$38.00
<br />$11,400.00
<br />$32.00
<br />$9,600.00
<br />$32.00
<br />$9,600.00
<br />25
<br />Conduit, PVC SCH. 40, 2 IN.
<br />100
<br />LFT
<br />$28.00
<br />$2,800.00
<br />$17.00
<br />$1,700.00
<br />$17.00
<br />$1,700.00
<br />26
<br />Signal Cable, Control, Copper, 5C/14 GA
<br />300
<br />LFT
<br />$5.00
<br />$1,500.00
<br />$4.50
<br />$1,350.00
<br />$4.50
<br />$1,350.00
<br />27
<br />Handhole, Adjust to Grade
<br />2
<br />1 EA
<br />$1,100.00
<br />$2,200.00
<br />$400.00
<br />$800.00
<br />$400.00
<br />$800.00
<br />28
<br />Manhole, Structure Adjustment
<br />3
<br />EA
<br />$200.00
<br />$600.00
<br />$940.00
<br />$2,820.00
<br />$531.00
<br />$1,593.00
<br />29
<br />Inlet, Structure Adjustment
<br />2
<br />EA
<br />$200.00
<br />$400.00
<br />$940.00
<br />$1,880.00
<br />$531.00
<br />$1,062.00
<br />30
<br />lWater Valve, Structure Adjustment
<br />4
<br />EA
<br />$100.00
<br />$400.00
<br />$65.00
<br />$260.00
<br />$350.00
<br />$1,400.00
<br />31
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$45,830.00
<br />$45,830.00
<br />$13,171.14
<br />$13,171.14
<br />$16,619.72
<br />$16,619.72
<br />32
<br />IMobilization and Demobilization
<br />1
<br />LS
<br />$32,730.00
<br />$32,730.00
<br />$16,400.00
<br />$16,400.00
<br />$22,779.12
<br />$22,779.12
<br />TOTAL BASE BID
<br />$733,260.00
<br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project.
<br />'if..' - - Z'e -
<br />Nitin Timble, P.E.
<br />Date: 3/27/2024
<br />$514,700.00
<br />Z' r/
<br />i 2•�f,\57fp�c�F 4j�
<br />N0.
<br />' 10707587
<br />$539,403.02