Laserfiche WebLink
SOUTH BEND 2024 COMMUNITY CROSSINGS - MEADE STREET Page 1 of 1 <br />CITY OF SOUTH BEND PROJECT NUMBER: 124-006 <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering Bid Date: 3/26/2024 <br />Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension <br />1 HMA Surface, Type B 682 TON $114.00 $77,748.00 $89.00 $60,698.00 $91.00 $62,062.00 <br />2 HMA Intermediate, Type B 1137 TON $97.00 $110,289.00 $73.00 $83,001.00 $72.75 $82,716.75 <br />3 Milling, Asphalt, 4 IN.8269 SYS $5.00 $41,345.00 $4.00 $33,076.00 $3.83 $31,670.27 <br />4 HMA for Patching, Full Depth, Type B 14 TON $290.00 $4,060.00 $218.00 $3,052.00 $91.00 $1,274.00 <br />5 Asphalt for Tack Coat 3 TON $700.00 $2,100.00 $1.00 $3.00 $650.00 $1,950.00 <br />6 Joint Adhesive, Surface 1856 LFT $1.00 $1,856.00 $0.01 $18.56 $0.60 $1,113.60 <br />7 Joint Adhesive, Intermediate 1856 LFT $1.00 $1,856.00 $0.01 $18.56 $0.65 $1,206.40 <br />8 Sidewalk, Concrete 49 SYS $120.00 $5,880.00 $145.00 $7,105.00 $142.00 $6,958.00 <br />9 Curb Ramp, Concrete 98 SYS $300.00 $29,400.00 $276.00 $27,048.00 $340.00 $33,320.00 <br />10 Detectable Warning Surface 32 SYS $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />11 Curb, Concrete 305 LFT $90.00 $27,450.00 $89.00 $27,145.00 $67.60 $20,618.00 <br />12 Line, Thermoplastic, Solid, White, 4 IN.3233 LFT $2.00 $6,466.00 $0.75 $2,424.75 $0.58 $1,875.14 <br />13 Transverse Marking, Thermoplastic, Stop Line, 24 IN.74 LFT $24.00 $1,776.00 $15.00 $1,110.00 $13.07 $967.18 <br />14 Transverse Marking, Thermoplastic, Crosswalk Line, White, 6 IN.435 LFT $8.00 $3,480.00 $5.00 $2,175.00 $2.24 $974.40 <br />15 Pavement Message Marking, Thermoplastic, Lane Indication Arrow 2 EA $250.00 $500.00 $200.00 $400.00 $203.00 $406.00 <br />16 Pavement Message Marking, Thermoplastic, Railroad Crossing 1 EA $200.00 $200.00 $1,000.00 $1,000.00 $989.00 $989.00 <br />17 Pavement Message Marking, Thermoplastic, Bicycle and Arrow Symbol 18 EA $300.00 $5,400.00 $400.00 $7,200.00 $607.00 $10,926.00 <br />18 Grooving for Pavement Markings 3458 LFT $2.00 $6,916.00 $1.25 $4,322.50 $0.52 $1,798.16 <br />19 Manhole, Structure Adjustment 4 EA $200.00 $800.00 $940.00 $3,760.00 $531.00 $2,124.00 <br />20 Inlet, Structure Adjustment 2 EA $200.00 $400.00 $940.00 $1,880.00 $531.00 $1,062.00 <br />21 Water Valve, Structure Adjustment 3 EA $100.00 $300.00 $65.00 $195.00 $350.00 $1,050.00 <br />22 Maintenance of Traffic 1 LS $22,980.00 $22,980.00 $37,267.63 $37,267.63 $15,089.68 $15,089.68 <br />23 Mobilization and Demobilization 1 LS $16,410.00 $16,410.00 $18,900.00 $18,900.00 $24,266.85 $24,266.85 <br />TOTAL BASE BID $367,612.00 $321,800.00 $304,417.43 <br />Date:3/27/2024 <br />Nitin Timble, P.E. <br />$321,800.00 <br />$0.00 <br />$45,812.00 <br />0.0% <br />$304,417.43 <br />$0.00 <br />$63,194.57 <br />0.0% <br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. <br />DIVISION 4 - MEADE STREET (FROM ECLIPSE PLACE TO ORANGE STREET) <br />Milestone Contractors, L.P.Reith Riley Construction Co, Inc. <br />17.2%12.5% <br />% Over <br />% Under <br />Engineer's Estimate <br />$367,612.00Base Bids Total <br />Amount Over <br />Amount Under