Laserfiche WebLink
SOUTH BEND 2024 COMMUNITY CROSSINGS - MEADE STREET <br />CITY OF SOUTH BEND PROJECT NUMBER: 124-006 <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering <br />Bid Date: 3/26/2024 <br />Page 1 of 1 <br />Base Bids Total <br />$367,612.00 <br />$321,800.00 <br />$304,417.43 <br />Amount Over <br />$0.00 <br />$0.00 <br />Amount Under <br />$45,812.00 <br />$63,194.57 <br />°/ Over <br />0.0% <br />0.0% <br />• Under <br />12.5% <br />17.2% <br />Engineer's Estimate <br />Milestone Contractors, L.P. <br />Reith Riley Construction Co, Inc. <br />DIVISION 4 - MEADE STREET (FROM <br />ECLIPSE PLACE TO ORANGE STREET) <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />1 <br />HMA Surface, T e B <br />682 <br />TON <br />$114.00 <br />$77,748.00 <br />$89.00 <br />$60,698.00 <br />$91.00 <br />$62,062.00 <br />2 <br />HMA Intermediate, Type B <br />1137 <br />TON <br />$97.00 <br />$110,289.00 <br />$73.00 <br />$83,001.00 <br />$72.75 <br />$82,716.75 <br />3 <br />Milling, Asphalt, 4 IN. <br />8269 <br />SYS <br />$5.00 <br />$41,345.00 <br />$4.00 <br />$33,076.00 <br />$3.83 <br />$31,670.27 <br />4 <br />HMA for Patching, Full Depth, Type B <br />14 <br />TON <br />$290.00 <br />$4,060.00 <br />$218.00 <br />$3,052.00 <br />$91.00 <br />$1,274.00 <br />5 <br />Asphalt for Tack Coat <br />3 <br />TON <br />$700.00 <br />$2,100.00 <br />$1.00 <br />$3.00 <br />$650.00 <br />$1,950.00 <br />6 <br />Joint Adhesive, Surface <br />1856 <br />LFT <br />$1.00 <br />$1,856.00 <br />$0.01 <br />$18.56 <br />$0.60 <br />$1,113.60 <br />7 <br />Joint Adhesive, Intermediate <br />1856 <br />LFT <br />$1.00 <br />$1,856.00 <br />$0.01 <br />$18.56 <br />$0.65 <br />$1,206.40 <br />8 <br />Sidewalk, Concrete <br />49 <br />SYS <br />$120.00 <br />$5,880.00 <br />$145.00 <br />$7,105.00 <br />$142.00 <br />$6,958.00 <br />9 <br />Curb Ramp, Concrete <br />98 <br />SYS <br />$300.00 <br />$29,400.00 <br />$276.00 <br />$27,048.00 <br />$340.00 <br />$33,320.00 <br />a 0 <br />32 <br />SYS <br />$0--00 <br />$0 00 <br />$0 90 <br />$0 00 <br />$0 90 <br />$0 00 <br />11 <br />Curb, Concrete <br />305 <br />LFT <br />$90.00 <br />$27,450.00 <br />$89.00 <br />$27,145.00 <br />$67.60 <br />$20,618.00 <br />12 <br />Line, Thermoplastic, Solid, White, 4 IN. <br />3233 <br />LFT <br />$2.00 <br />$6,466.00 <br />$0.75 <br />$2,424.75 <br />$0.58 <br />$1,875.14 <br />13 <br />Transverse Marking, Thermoplastic, Stop Line, 24 IN. <br />74 <br />LFT <br />$24.00 <br />$1,776.00 <br />$15.00 <br />$1,110.00 <br />$13.07 <br />$967.18 <br />14 <br />Transverse Marking, Thermoplastic, Crosswalk Line, White, 6 IN. <br />435 <br />LFT <br />$8.00 <br />$3,480.00 <br />$5.00 <br />$2,175.00 <br />$2.24 <br />$974.40 <br />15 <br />Pavement Message Marking, Thermoplastic, Lane Indication Arrow <br />2 <br />EA <br />$250.00 <br />$500.00 <br />$200.00 <br />$400.00 <br />$203.00 <br />$406.00 <br />16 <br />Pavement Message Marking, Thermoplastic, Railroad Crossing <br />1 <br />EA <br />$200.00 <br />$200.00 <br />$1,000.00 <br />$1,000.00 <br />$989.00 <br />$989.00 <br />17 <br />Pavement Message Marking, Thermoplastic, Bicycle and Arrow Symbol <br />18 <br />EA <br />$300.00 <br />$5,400.00 <br />$400.00 <br />$7,200.00 <br />$607.00 <br />$10,926.00 <br />18 <br />Grooving for Pavement Markings <br />3458 <br />LFT <br />$2.00 <br />$6,916.00 <br />$1.25 <br />$4,322.50 <br />$0.52 <br />$1,798.16 <br />19 <br />Manhole, Structure Adjustment <br />4 <br />EA <br />$200.00 <br />$800.00 <br />$940.00 <br />$3,760.00 <br />$531.00 <br />$2,124.00 <br />20 <br />Inlet, Structure Adjustment <br />2 <br />EA <br />$200.00 <br />$400.00 <br />$940.00 <br />$1,880.00 <br />$531.00 <br />$1,062.00 <br />21 <br />Water Valve, Structure Adjustment <br />3 <br />EA <br />$100.00 <br />$300.00 <br />$65.00 <br />$195.00 <br />$350.00 <br />$1,050.00 <br />22 <br />Maintenance of Traffic <br />1 <br />LS <br />$22,980.00 <br />$22,980.00 <br />$37,267.63 <br />$37,267.63 <br />$15,089.68 <br />$15,089.68 <br />23 <br />Mobilization and Demobilization <br />1 <br />LS <br />$16,410.00 <br />$16,410.00 <br />$18,900.00 <br />$18,900.00 <br />$24,266.85 <br />$24,266.85 <br />TOTAL BASE BID <br />$367,612.00 <br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. <br />Date: 3/27/2024 <br />Nitin Timble, P.E. <br />$321,800.00 <br />�E`/% <br />s N0. <br />10707587 <br />///'7j77��p 701YAL �� <br />$304,417.43 <br />