SOUTH BEND 2024 COMMUNITY CROSSINGS - MEADE STREET
<br />CITY OF SOUTH BEND PROJECT NUMBER: 124-006
<br />BID TABULATION SHEET
<br />Prepared by: A&Z Engineering
<br />Bid Date: 3/26/2024
<br />Page 1 of 1
<br />Base Bids Total
<br />$367,612.00
<br />$321,800.00
<br />$304,417.43
<br />Amount Over
<br />$0.00
<br />$0.00
<br />Amount Under
<br />$45,812.00
<br />$63,194.57
<br />°/ Over
<br />0.0%
<br />0.0%
<br />• Under
<br />12.5%
<br />17.2%
<br />Engineer's Estimate
<br />Milestone Contractors, L.P.
<br />Reith Riley Construction Co, Inc.
<br />DIVISION 4 - MEADE STREET (FROM
<br />ECLIPSE PLACE TO ORANGE STREET)
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Extension
<br />Unit Price
<br />Extension
<br />Unit Price
<br />Extension
<br />1
<br />HMA Surface, T e B
<br />682
<br />TON
<br />$114.00
<br />$77,748.00
<br />$89.00
<br />$60,698.00
<br />$91.00
<br />$62,062.00
<br />2
<br />HMA Intermediate, Type B
<br />1137
<br />TON
<br />$97.00
<br />$110,289.00
<br />$73.00
<br />$83,001.00
<br />$72.75
<br />$82,716.75
<br />3
<br />Milling, Asphalt, 4 IN.
<br />8269
<br />SYS
<br />$5.00
<br />$41,345.00
<br />$4.00
<br />$33,076.00
<br />$3.83
<br />$31,670.27
<br />4
<br />HMA for Patching, Full Depth, Type B
<br />14
<br />TON
<br />$290.00
<br />$4,060.00
<br />$218.00
<br />$3,052.00
<br />$91.00
<br />$1,274.00
<br />5
<br />Asphalt for Tack Coat
<br />3
<br />TON
<br />$700.00
<br />$2,100.00
<br />$1.00
<br />$3.00
<br />$650.00
<br />$1,950.00
<br />6
<br />Joint Adhesive, Surface
<br />1856
<br />LFT
<br />$1.00
<br />$1,856.00
<br />$0.01
<br />$18.56
<br />$0.60
<br />$1,113.60
<br />7
<br />Joint Adhesive, Intermediate
<br />1856
<br />LFT
<br />$1.00
<br />$1,856.00
<br />$0.01
<br />$18.56
<br />$0.65
<br />$1,206.40
<br />8
<br />Sidewalk, Concrete
<br />49
<br />SYS
<br />$120.00
<br />$5,880.00
<br />$145.00
<br />$7,105.00
<br />$142.00
<br />$6,958.00
<br />9
<br />Curb Ramp, Concrete
<br />98
<br />SYS
<br />$300.00
<br />$29,400.00
<br />$276.00
<br />$27,048.00
<br />$340.00
<br />$33,320.00
<br />a 0
<br />32
<br />SYS
<br />$0--00
<br />$0 00
<br />$0 90
<br />$0 00
<br />$0 90
<br />$0 00
<br />11
<br />Curb, Concrete
<br />305
<br />LFT
<br />$90.00
<br />$27,450.00
<br />$89.00
<br />$27,145.00
<br />$67.60
<br />$20,618.00
<br />12
<br />Line, Thermoplastic, Solid, White, 4 IN.
<br />3233
<br />LFT
<br />$2.00
<br />$6,466.00
<br />$0.75
<br />$2,424.75
<br />$0.58
<br />$1,875.14
<br />13
<br />Transverse Marking, Thermoplastic, Stop Line, 24 IN.
<br />74
<br />LFT
<br />$24.00
<br />$1,776.00
<br />$15.00
<br />$1,110.00
<br />$13.07
<br />$967.18
<br />14
<br />Transverse Marking, Thermoplastic, Crosswalk Line, White, 6 IN.
<br />435
<br />LFT
<br />$8.00
<br />$3,480.00
<br />$5.00
<br />$2,175.00
<br />$2.24
<br />$974.40
<br />15
<br />Pavement Message Marking, Thermoplastic, Lane Indication Arrow
<br />2
<br />EA
<br />$250.00
<br />$500.00
<br />$200.00
<br />$400.00
<br />$203.00
<br />$406.00
<br />16
<br />Pavement Message Marking, Thermoplastic, Railroad Crossing
<br />1
<br />EA
<br />$200.00
<br />$200.00
<br />$1,000.00
<br />$1,000.00
<br />$989.00
<br />$989.00
<br />17
<br />Pavement Message Marking, Thermoplastic, Bicycle and Arrow Symbol
<br />18
<br />EA
<br />$300.00
<br />$5,400.00
<br />$400.00
<br />$7,200.00
<br />$607.00
<br />$10,926.00
<br />18
<br />Grooving for Pavement Markings
<br />3458
<br />LFT
<br />$2.00
<br />$6,916.00
<br />$1.25
<br />$4,322.50
<br />$0.52
<br />$1,798.16
<br />19
<br />Manhole, Structure Adjustment
<br />4
<br />EA
<br />$200.00
<br />$800.00
<br />$940.00
<br />$3,760.00
<br />$531.00
<br />$2,124.00
<br />20
<br />Inlet, Structure Adjustment
<br />2
<br />EA
<br />$200.00
<br />$400.00
<br />$940.00
<br />$1,880.00
<br />$531.00
<br />$1,062.00
<br />21
<br />Water Valve, Structure Adjustment
<br />3
<br />EA
<br />$100.00
<br />$300.00
<br />$65.00
<br />$195.00
<br />$350.00
<br />$1,050.00
<br />22
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$22,980.00
<br />$22,980.00
<br />$37,267.63
<br />$37,267.63
<br />$15,089.68
<br />$15,089.68
<br />23
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$16,410.00
<br />$16,410.00
<br />$18,900.00
<br />$18,900.00
<br />$24,266.85
<br />$24,266.85
<br />TOTAL BASE BID
<br />$367,612.00
<br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project.
<br />Date: 3/27/2024
<br />Nitin Timble, P.E.
<br />$321,800.00