Laserfiche WebLink
SOUTH BEND 2024 COMMUNITY CROSSINGS - WESTERN AVE Page 1 of 1 <br />CITY OF SOUTH BEND PROJECT NUMBER: 124-006 <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering Bid Date: 3/26/2024 <br />Item Description Quantity Unit Unit Price Extension Unit Price Extension Unit Price Extension <br />1 HMA Surface, Type B 1822 TON $116.00 $211,352.00 $82.00 $149,404.00 $91.00 $165,802.00 <br />2 HMA Intermediate, Type B 3036 TON $98.00 $297,528.00 $69.00 $209,484.00 $72.75 $220,869.00 <br />3 Milling, Asphalt, 4 IN.22077 SYS $5.00 $110,385.00 $4.00 $88,308.00 $3.83 $84,554.91 <br />4 HMA for Patching, Full Depth, Type B 486 TON $290.00 $140,940.00 $50.00 $24,300.00 $91.00 $44,226.00 <br />5 Asphalt for Tack Coat 8 TON $700.00 $5,600.00 $1.00 $8.00 $650.00 $5,200.00 <br />6 Joint Adhesive, Surface 16425 LFT $1.00 $16,425.00 $0.01 $164.25 $0.60 $9,855.00 <br />7 Joint Adhesive, Intermediate 16425 LFT $1.00 $16,425.00 $0.01 $164.25 $0.65 $10,676.25 <br />8 Liquid Asphalt Sealant 16425 LFT $1.00 $16,425.00 $0.01 $164.25 $0.10 $1,642.50 <br />9 Compacted Aggregate, No. 53 737 TON $81.00 $59,697.00 $16.00 $11,792.00 $25.00 $18,425.00 <br />10 Sidewalk, Concrete 53 SYS $120.00 $6,360.00 $117.00 $6,201.00 $142.00 $7,526.00 <br />11 Line, Thermoplastic, Solid, Yellow, 4 IN.5333 LFT $3.00 $15,999.00 $0.75 $3,999.75 $0.58 $3,093.14 <br />12 Line, Thermoplastic, Broken, Yellow, 4 IN.946 LFT $1.00 $946.00 $0.85 $804.10 $0.78 $737.88 <br />13 Line, Thermoplastic, Solid, White, 4 IN.12903 LFT $1.00 $12,903.00 $0.75 $9,677.25 $0.58 $7,483.74 <br />14 Line, Thermoplastic, Dotted, White, 4 IN.80 LFT $3.00 $240.00 $0.85 $68.00 $2.88 $230.40 <br />15 Transverse Marking, Thermoplastic, Stop Line, 24 IN.187 LFT $20.00 $3,740.00 $15.00 $2,805.00 $13.07 $2,444.09 <br />16 Transverse Marking, Thermoplastic, Crosshatch Line, White, 6 IN.1179 LFT $3.00 $3,537.00 $5.00 $5,895.00 $2.24 $2,640.96 <br />17 Transverse Marking, Thermoplastic, Crosshatch Line, Yellow, 12 IN.235 LFT $7.00 $1,645.00 $10.00 $2,350.00 $4.37 $1,026.95 <br />18 Transverse Marking, Thermoplastic, Crosswalk Line, White, 6 IN.1100 LFT $9.00 $9,900.00 $5.00 $5,500.00 $2.24 $2,464.00 <br />19 Transverse Marking, Thermoplastic, Parking Line, White, 4 IN.756 LFT $4.00 $3,024.00 $7.00 $5,292.00 $2.08 $1,572.48 <br />20 Transverse Marking, Thermoplastic, Parking Line, Blue, 4 IN.16 LFT $8.00 $128.00 $10.00 $160.00 $4.34 $69.44 <br />21 Pavement Message Marking, Thermoplastic, Lane Indication Arrow 25 EA $196.00 $4,900.00 $200.00 $5,000.00 $203.00 $5,075.00 <br />22 Pavement Message Marking, Thermoplastic, Bicycle and Arrow Symbol 30 EA $265.00 $7,950.00 $400.00 $12,000.00 $607.00 $18,210.00 <br />23 Pavement Message Marking, Thermoplastic, Word "ONLY"3 EA $305.00 $915.00 $250.00 $750.00 $221.00 $663.00 <br />24 Grooving for Pavement Markings 19262 LFT $2.00 $38,524.00 $1.25 $24,077.50 $0.52 $10,016.24 <br />25 Signal Pole, Pedestal, 12 FT.6 EA $1,190.00 $7,140.00 $1,400.00 $8,400.00 $1,400.00 $8,400.00 <br />26 Signal Pole Foundation 6 EA $1,600.00 $9,600.00 $1,100.00 $6,600.00 $1,100.00 $6,600.00 <br />27 Pedestrian Signal Head, Countdown, 18 IN.8 EA $1,000.00 $8,000.00 $819.00 $6,552.00 $819.00 $6,552.00 <br />28 Pedestrian Push Button, APS 8 EA $1,300.00 $10,400.00 $1,400.00 $11,200.00 $1,400.00 $11,200.00 <br />29 Adjustable Bracket Extension 2 EA $500.00 $1,000.00 $250.00 $500.00 $250.00 $500.00 <br />30 Conduit, HDPE SCH. 80, 2 IN.100 LFT $38.00 $3,800.00 $32.00 $3,200.00 $32.00 $3,200.00 <br />31 Conduit, PVC SCH. 40, 2 IN.60 LFT $29.00 $1,740.00 $17.00 $1,020.00 $17.00 $1,020.00 <br />32 Signal Cable, Control, Copper, 3C/14 GA 1100 LFT $3.00 $3,300.00 $4.00 $4,400.00 $4.00 $4,400.00 <br />33 Signal Cable, Control, Copper, 5C/14 GA 1100 LFT $6.00 $6,600.00 $4.50 $4,950.00 $4.50 $4,950.00 <br />34 Handhole, Adjust to Grade 2 EA $1,100.00 $2,200.00 $400.00 $800.00 $400.00 $800.00 <br />35 Traffic Signal Equipment, Remove 1 EA $2,000.00 $2,000.00 $700.00 $700.00 $700.00 $700.00 <br />36 Maintenance of Traffic 1 LS $72,870.00 $72,870.00 $44,309.65 $44,309.65 $57,424.23 $57,424.23 <br />37 Mobilization and Demobilization 1 LS $52,050.00 $52,050.00 $39,000.00 $39,000.00 $56,762.82 $56,762.82 <br />TOTAL BASE BID $1,166,188.00 $700,000.00 $787,013.03 <br />Date:3/27/2024 <br />Nitin Timble, P.E. <br />Milestone Contractors, L.P.Reith Riley Construction Co, Inc. <br />% Over 0.0%0.0% <br />% Under 40.0%32.5% <br />Engineer's Estimate <br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. <br />DIVISION 1 - WESTERN AVE (FROM S. OLIVE STREET TO S. WALNUT STREET) <br />$700,000.00 $787,013.03 <br />$0.00 $0.00 <br />Amount Under $466,188.00 $379,174.97 <br />$1,166,188.00Base Bids Total <br />Amount Over