Laserfiche WebLink
SOUTH BEND 2024 COMMUNITY CROSSINGS - WESTERN AVE <br />CITY OF SOUTH BEND PROJECT NUMBER: 124-006 <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering <br />Bid Date: 3/26/2024 <br />Page 1 of 1 <br />Base Bids Total <br />$1,166,188.00 <br />$700,000.00 <br />$787,013.03 <br />Amount Over <br />$0.00 <br />$0.00 <br />Amount Under <br />$466,188.00 <br />$379,174.97 <br />°/ Over <br />0.0% <br />0.0% <br />• Under <br />40.0% <br />32.5% <br />Engineer's Estimate <br />Milestone Contractors, L.P. <br />Reith Riley Construction Co, Inc. <br />DIVISION 1 - WESTERN AVE (FROM <br />S. OLIVE STREET TO S. WALNUT STREET) <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />Unit Price <br />Extension <br />1 <br />HMA Surface, T e B <br />1822 <br />TON <br />$116.00 <br />$211,352.00 <br />$82.00 <br />$149,404.00 <br />$91.00 <br />$165,802.00 <br />2 <br />HMA Intermediate, Type B <br />3036 <br />TON <br />$98.00 <br />$297,528.00 <br />$69.00 <br />$209,484.00 <br />$72.75 <br />$220,869.00 <br />3 <br />Milling, Asphalt, 4 IN. <br />22077 <br />SYS <br />$5.00 <br />$110,385.00 <br />$4.00 <br />$88,308.00 <br />$3.83 <br />$84,554.91 <br />4 <br />HMA for Patching, Full Depth, Type B <br />486 <br />TON <br />$290.00 <br />$140,940.00 <br />$50.00 <br />$24,300.00 <br />$91.00 <br />$44,226.00 <br />5 <br />Asphalt for Tack Coat <br />8 <br />TON <br />$700.00 <br />$5,600.00 <br />$1.00 <br />$8.00 <br />$650.00 <br />$5,200.00 <br />6 <br />Joint Adhesive, Surface <br />16425 <br />LFT <br />$1.00 <br />$16,425.00 <br />$0.01 <br />$164.25 <br />$0.60 <br />$9,855.00 <br />7 <br />Joint Adhesive, Intermediate <br />16425 <br />LFT <br />$1.00 <br />$16,425.00 <br />$0.01 <br />$164.25 <br />$0.65 <br />$10,676.25 <br />8 <br />Liquid Asphalt Sealant <br />16425 <br />LFT <br />$1.00 <br />$16,425.00 <br />$0.01 <br />$164.25 <br />$0.10 <br />$1,642.50 <br />9 <br />Compacted Aggre ate, No. 53 <br />737 <br />TON <br />$81.00 <br />$59,697.00 <br />$16.00 <br />$11,792.00 <br />$25.00 <br />$18,425.00 <br />10 <br />Sidewalk, Concrete <br />53 <br />SYS <br />$120.00 <br />$6,360.00 <br />$117.00 <br />$6,201.00 <br />$142.00 <br />$7,526.00 <br />11 <br />Line, Thermoplastic, Solid, Yellow, 4 IN. <br />5333 <br />LFT <br />$3.00 <br />$15,999.00 <br />$0.75 <br />$3,999.75 <br />$0.58 <br />$3,093.14 <br />12 <br />Line, Thermoplastic, Broken, Yellow, 4 IN. <br />946 <br />LFT <br />$1.00 <br />$946.00 <br />$0.85 <br />$804.10 <br />$0.78 <br />$737.88 <br />13 <br />Line, Thermoplastic, Solid, White, 4 IN. <br />12903 <br />LFT <br />$1.00 <br />$12,903.00 <br />$0.75 <br />$9,677.25 <br />$0.58 <br />$7,483.74 <br />14 <br />Line, Thermoplastic, Dotted, White, 4 IN. <br />80 <br />LFT <br />$3.00 <br />$240.00 <br />$0.85 <br />$68.00 <br />$2.88 <br />$230.40 <br />15 <br />Transverse Marking, Thermoplastic, Stop Line, 24 IN. <br />187 <br />LFT <br />$20.00 <br />$3,740.00 <br />$15.00 <br />$2,805.00 <br />$13.07 <br />$2,444.09 <br />16 <br />Transverse Marking, Thermoplastic, Crosshatch Line, White, 6 IN. <br />1179 <br />LFT <br />$3.00 <br />$3,537.00 <br />$5.00 <br />$5,895.00 <br />$2.24 <br />$2,640.96 <br />17 <br />Transverse Marking, Thermoplastic, Crosshatch Line, Yellow, 12 IN. <br />235 <br />LFT <br />$7.00 <br />$1,645.00 <br />$10.00 <br />$2,350.00 <br />$4.37 <br />$1,026.95 <br />18 <br />Transverse Marking, Thermoplastic, Crosswalk Line, White, 6 IN. <br />1100 <br />LFT <br />$9.00 <br />$9,900.00 <br />$5.00 <br />$5,500.00 <br />$2.24 <br />$2,464.00 <br />19 <br />Transverse Marking, Thermoplastic, Parking Line, White, 4 IN. <br />756 <br />LFT <br />$4.00 <br />$3,024.00 <br />$7.00 <br />$5,292.00 <br />$2.08 <br />$1,572.48 <br />20 <br />Transverse Marking, Thermoplastic, Parking Line, Blue, 4 IN. <br />16 <br />LFT <br />$8.00 <br />$128.00 <br />$10.00 <br />$160.00 <br />$4.34 <br />$69.44 <br />21 <br />Pavement Message Marking, Thermoplastic, Lane Indication Arrow <br />25 <br />EA <br />$196.00 <br />$4,900.00 <br />$200.00 <br />$5,000.00 <br />$203.00 <br />$5,075.00 <br />22 <br />Pavement Message Marking, Thermoplastic, Bicycle and Arrow Symbol <br />30 <br />EA <br />$265.00 <br />$7,950.00 <br />$400.00 <br />$12,000.00 <br />$607.00 <br />$18,210.00 <br />23 <br />Pavement Message Marking, Thermoplastic, Word "ONLY" <br />3 <br />EA <br />$305.00 <br />$915.00 <br />$250.00 <br />$750.00 <br />$221.00 <br />$663.00 <br />24 <br />Grooving for Pavement Markings <br />19262 <br />LFT <br />$2.00 <br />$38,524.00 <br />$1.25 <br />$24,077.50 <br />$0.52 <br />$10,016.24 <br />25 <br />Signal Pole, Pedestal, 12 FT. <br />6 <br />EA <br />$1,190.00 <br />$7,140.00 <br />$1,400.00 <br />$8,400.00 <br />$1,400.00 <br />$8,400.00 <br />26 <br />Signal Pole Foundation <br />6 <br />EA <br />$1,600.00 <br />$9,600.00 <br />$1,100.00 <br />$6,600.00 <br />$1,100.00 <br />$6,600.00 <br />27 <br />Pedestrian Signal Head, Countdown, 18 IN. <br />8 <br />EA <br />$1,000.00 <br />$8,000.00 <br />$819.00 <br />$6,552.00 <br />$819.00 <br />$6,552.00 <br />28 <br />Pedestrian Push Button, APS <br />8 <br />EA <br />$1,300.00 <br />$10,400.00 <br />$1,400.00 <br />$11,200.00 <br />$1,400.00 <br />$11,200.00 <br />29 <br />Adjustable Bracket Extension <br />2 <br />EA <br />$500.00 <br />$1,000.00 <br />$250.00 <br />$500.00 <br />$250.00 <br />$500.00 <br />30 <br />Conduit, HDPE SCH. 80, 2 IN. <br />100 <br />LFT <br />$38.00 <br />$3,800.00 <br />$32.00 <br />$3,200.00 <br />$32.00 <br />$3,200.00 <br />31 <br />Conduit, PVC SCH. 40, 2 IN. <br />60 <br />LFT <br />$29.00 <br />$1,740.00 <br />$17.00 <br />$1,020.00 <br />$17.00 <br />$1,020.00 <br />32 <br />Signal Cable, Control, Copper, 3C/14 GA <br />1100 <br />LFT <br />$3.00 <br />$3,300.00 <br />$4.00 <br />$4,400.00 <br />$4.00 <br />$4,400.00 <br />33 <br />Signal Cable, Control, Copper, 5C/14 GA <br />1100 <br />1 LFT <br />$6.00 <br />$6,600.00 <br />$4.50 <br />$4,950.00 <br />$4.50 <br />$4,950.00 <br />34 <br />Handhole, Adjust to Grade <br />2 <br />EA <br />$1,100.00 <br />$2,200.00 <br />$400.00 <br />$800.00 <br />$400.00 <br />$800.00 <br />35 <br />Traffic Signal Equipment, Remove <br />1 <br />EA <br />$2,000.00 <br />$2,000.00 <br />$700.00 <br />$700.00 <br />$700.00 <br />$700.00 <br />36 <br />1 Maintenance of Traffic <br />1 <br />LS <br />1 $72,870.00 <br />1 $72870.00 <br />$44,309.65 <br />$44,309.65 <br />$57,424.23 <br />$57,424.23 <br />37 <br />Mobilization and Demobilization <br />1 <br />LS <br />$52,050.00 <br />$52:050.00 <br />$39,000.00 <br />$39,000.00 <br />$56,762.821 <br />$56,762.82 <br />TOTAL BASE BID $1,166,188.00 <br />1 herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this project. <br />Date: 3/27/2024 <br />Nitin Timble, P.E. <br />?�......... <br />\57fq��E`/4i <br />s IVo. <br />` 10707587 s <br />rluuu►\\�\a���� <br />$700,000.00 <br />$787,013.03 <br />