Laserfiche WebLink
SOUTH BEND 2024 COMMUNITY CROSSINGS - MEADE STREET Page 1 of 1 <br />CITY OF SOUTH BEND PROJECT NUMBER: 124-006 <br />BID TABULATION SHEET <br />Prepared by: A&Z Engineering Bid Date: 3/26/2024 <br />BASE BIDS <br />Division Description <br />1 Western Ave (From S. Olive St to S. Walnut St) <br />2 Western Ave (From S. Albert Ave to S. Falcon St) <br />3 Bendix Dr (From Westmoor St to Eclipse Pl) <br />4 Meade St (From Eclipse Pl to Orange St) <br />TOTAL BASE BIDS $3,279,789.00 $2,223,500.00 $2,390,239.00 <br />Date:3/27/2024 <br />Nitin Timble, P.E. <br />$539,403.02 <br />$304,417.43 <br />$1,056,289.00 $889,550.00 <br />% Over 0.0%0.0% <br />$2,223,500.00 $2,390,239.00 <br />Amount Over $0.00 $0.00 <br />$787,013.03 <br />$759,405.52 <br />Engineer's Estimate <br />$3,279,789.00Base Bids Total <br />Amount Under <br />% Under <br />Milestone Contractors, L.P.Reith Riley Construction Co, Inc. <br />32.2%27.1% <br />Amount Amount Amount <br />$1,166,188.00 <br />$1,012,729.00 <br />$733,260.00 <br />$367,612.00 <br />$700,000.00 <br />$687,000.00 <br />$514,700.00 <br />$321,800.00 <br />I herby certify to the best of my knowledge, that the bid tabulation presented is a true and correct copy of the bids received for this <br />project.