HRP Construction Inc.
<br />BIDIPROPOSAL Addendum No.1
<br />CITY OF SOUn!LBEND
<br />31.
<br />Joint Adhesive, Surface Course
<br />3,205
<br />LFT
<br />1.00
<br />3,205.00
<br />32.
<br />PCCP, 8"
<br />750
<br />SYD
<br />104.00
<br />78,000.00
<br />33.
<br />PCCP, Colored, 8"
<br />220
<br />SYD
<br />122.50
<br />26,950.00
<br />34.
<br />PCCP for Approaches, 6"
<br />60
<br />SYD
<br />84.00
<br />5,040.00
<br />35.
<br />PCCP for Approaches,8"
<br />300
<br />SYD
<br />85.00
<br />25,500.00
<br />36.
<br />Decorative Brick Pavers
<br />20
<br />SYD
<br />628.43
<br />12,568.60
<br />37.
<br />Brick Pavement
<br />70
<br />SYD
<br />307.15
<br />21,500.50
<br />38.
<br />Concrete Curb
<br />3.115
<br />LFT
<br />28.50
<br />88,777.50
<br />39.
<br />Concrete Curb and Gutter
<br />2,905
<br />LFT
<br />27.50
<br />79,887.50
<br />40.
<br />Concrete Sidewalk, 4"
<br />1,430
<br />SYD
<br />66.00
<br />94,380.00
<br />41_
<br />Concrete Sidewalk, 5"
<br />2,680
<br />SYD
<br />62.00
<br />166,160.00
<br />42.
<br />Concrete Sidewalk, Colored, 5"
<br />100
<br />SYD
<br />132.00
<br />13,200.00
<br />43.
<br />Concrete Curb Ramp
<br />400
<br />SYD
<br />126.00
<br />50,400.00
<br />44.
<br />Concrete Curb Ramp, Colored
<br />20
<br />SYD
<br />225.00
<br />4,500,00
<br />45.
<br />Detectable Warning Surface
<br />60
<br />SYD
<br />98.50
<br />4,925.00
<br />46.
<br />Sodding
<br />6,400
<br />SYD
<br />14.00
<br />75,600.00
<br />4T
<br />Street Tree
<br />101
<br />EA
<br />695.00
<br />70,195.00
<br />48.
<br />Shrub
<br />13
<br />EA
<br />95.00
<br />1,235.00
<br />49.
<br />Perennial
<br />118
<br />EA
<br />40.00
<br />4,720.00
<br />50.
<br />Tree Protection
<br />11
<br />EA
<br />350.00
<br />3,850.00
<br />51.
<br />Irrigation Allowance
<br />1
<br />LS
<br />$15,000.00
<br />$15,000.00
<br />52.
<br />Bench
<br />5
<br />EA
<br />5,300.00
<br />26,500.00
<br />53.
<br />Trash Receptacle
<br />1
<br />EA
<br />3,175.00
<br />3,175.00
<br />54.
<br />Bike Rack
<br />16
<br />EA
<br />2,175.00
<br />34,800.00
<br />55.
<br />Storm Sewer Manhole, 48"
<br />17
<br />EA
<br />7,500.00
<br />127,500.00
<br />56.
<br />Storm Sewer Manhole with Protective Coating, 48"
<br />2
<br />EA
<br />8,000,00
<br />16,000.00
<br />57.
<br />Storm Sewer Manhole, Doghouse, 48"
<br />1
<br />EA
<br />10,000.00
<br />10,000.00
<br />58.
<br />Storm Sewer Catch Basin
<br />5
<br />EA
<br />5,000.00
<br />25,000.00
<br />59.
<br />Storm Sewer Pipe, 12"
<br />1,365
<br />LFT
<br />54.00
<br />73,710.00
<br />60.
<br />Storm Sewer Pipe,15"
<br />515
<br />LFT
<br />56.00
<br />28,840.00
<br />61.
<br />Storm Sewer Pipe, Water Main Grade, 15"
<br />105
<br />LFT
<br />95.00
<br />9,975.00
<br />62.
<br />Storm Sewer Pipe, 18"
<br />295
<br />LFT
<br />63.00
<br />18,585.00
<br />63.
<br />Connect to Structure
<br />5
<br />EA
<br />5,000.00
<br />25,000.00
<br />64.
<br />Water Main, 8"
<br />3,510
<br />LFT
<br />95.00
<br />333,450.00
<br />65.
<br />Water Service, 1"
<br />1,000
<br />LFT
<br />56.00
<br />56,000.00
<br />66.
<br />Gate Valve, 8"
<br />20
<br />EA
<br />5,000.00
<br />100,000.00
<br />67.
<br />Line Stop, 6"
<br />10
<br />EA
<br />11,000.00
<br />110,000.00
<br />Version 09/2912021 Contractor's Bid for Public Works - 8
<br />
|