SIDIPROPOSAL Addendum No.1
<br />CITY OF SOUTH SEND
<br />Project Name: Downtown South Bend to Notre Dame Trail -Hill Street -South Bend Ave.
<br />Project Number: 122-040B
<br />For Bids Due: April 9, 2024
<br />Contractor Name: HRP Construction Inc.
<br />Base Bid
<br />Item
<br />No.
<br />Description
<br />0uantl
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />t
<br />LS
<br />45,000.00
<br />45,000.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />230,000.00
<br />230,000.00
<br />3.
<br />Maintenance of Traffic
<br />I
<br />LS
<br />45,000.00
<br />45,000.00
<br />4.
<br />Erosion Control
<br />I
<br />LS
<br />40,000.00
<br />40,000.00
<br />S.
<br />Clearing Right of Way
<br />1
<br />LS
<br />318,317.80
<br />318,317.80
<br />6.
<br />Railroad Ties, Remove
<br />1,5W
<br />LFT
<br />15.00
<br />22,500.00
<br />7.
<br />Common Excavation
<br />4,550
<br />CYD
<br />60.00
<br />273,000.00
<br />8.
<br />B Borrow
<br />1,650
<br />CYD
<br />14.00
<br />23,100.00
<br />9,
<br />Structure Backfill, Undistributed
<br />500
<br />CYD
<br />14.00
<br />7,000.00
<br />10.
<br />Tree, &', Remove
<br />1
<br />EA
<br />350.00
<br />MOM
<br />11.
<br />Tree, 10", Remove
<br />4
<br />EA
<br />500.00
<br />2,000.00
<br />12.
<br />Tree, 18", Remove
<br />6
<br />EA
<br />875.00
<br />5,250.00
<br />13.
<br />Tree, 30", Remove
<br />1
<br />EA
<br />1,750.00
<br />1,750.00
<br />14.
<br />Sign, Remove
<br />21
<br />EA
<br />50.00
<br />1,050.00
<br />15.
<br />Sign, =Relocate
<br />4
<br />EA
<br />75.00
<br />300.00
<br />16.
<br />Light Pole, Remove
<br />15
<br />EA
<br />650.00
<br />9,750.00
<br />17.
<br />Pipe, Remove
<br />4,585
<br />LFT
<br />8.00
<br />36,680.00
<br />18.
<br />Structures, Remove
<br />28
<br />EA
<br />600.00
<br />16,800.00
<br />19.
<br />Fire Hydrant, Remove
<br />6
<br />EA
<br />1,250.00
<br />6,250.00
<br />20.
<br />Concrete Curb, Remove
<br />5,565
<br />LFT
<br />4.00
<br />22,260.00
<br />21.
<br />Concrete Approaches and Sidewalk, Remove
<br />3,315
<br />SYD
<br />8.00
<br />26,520.00
<br />22. lConcrete
<br />Pavement, Remove
<br />6,820
<br />SYD
<br />10.00
<br />68,200.00
<br />23.
<br />Brick, Remove and Salvage
<br />1,345
<br />SYD
<br />7.00
<br />9,415.00
<br />24.
<br />Compacted Aggregate, No, 53
<br />5,110
<br />TON
<br />38.00
<br />194,180.00
<br />25.
<br />Item Omitted
<br />26. 1
<br />HMA for Patching
<br />10
<br />TON
<br />412.50
<br />4,125.00
<br />27. IHMA
<br />Surface, 9,5 mm - Type S, PG 70-22P
<br />810
<br />TON
<br />112.00
<br />90,720.00
<br />28. 1
<br />HMA intermediate, 12.5 mm - Type B, PG 64-22
<br />1,340
<br />TON
<br />90.00
<br />120,600.00
<br />29.
<br />HMA Base, 25 mm - Type B, PG 64-22
<br />3,200
<br />TON
<br />75.00
<br />240,000.00
<br />30.
<br />Tack Coat
<br />2
<br />548.00
<br />1,479.60
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7