Laserfiche WebLink
SIDIPROPOSAL Addendum No.1 <br />CITY OF SOUTH SEND <br />Project Name: Downtown South Bend to Notre Dame Trail -Hill Street -South Bend Ave. <br />Project Number: 122-040B <br />For Bids Due: April 9, 2024 <br />Contractor Name: HRP Construction Inc. <br />Base Bid <br />Item <br />No. <br />Description <br />0uantl <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />t <br />LS <br />45,000.00 <br />45,000.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />230,000.00 <br />230,000.00 <br />3. <br />Maintenance of Traffic <br />I <br />LS <br />45,000.00 <br />45,000.00 <br />4. <br />Erosion Control <br />I <br />LS <br />40,000.00 <br />40,000.00 <br />S. <br />Clearing Right of Way <br />1 <br />LS <br />318,317.80 <br />318,317.80 <br />6. <br />Railroad Ties, Remove <br />1,5W <br />LFT <br />15.00 <br />22,500.00 <br />7. <br />Common Excavation <br />4,550 <br />CYD <br />60.00 <br />273,000.00 <br />8. <br />B Borrow <br />1,650 <br />CYD <br />14.00 <br />23,100.00 <br />9, <br />Structure Backfill, Undistributed <br />500 <br />CYD <br />14.00 <br />7,000.00 <br />10. <br />Tree, &', Remove <br />1 <br />EA <br />350.00 <br />MOM <br />11. <br />Tree, 10", Remove <br />4 <br />EA <br />500.00 <br />2,000.00 <br />12. <br />Tree, 18", Remove <br />6 <br />EA <br />875.00 <br />5,250.00 <br />13. <br />Tree, 30", Remove <br />1 <br />EA <br />1,750.00 <br />1,750.00 <br />14. <br />Sign, Remove <br />21 <br />EA <br />50.00 <br />1,050.00 <br />15. <br />Sign, =Relocate <br />4 <br />EA <br />75.00 <br />300.00 <br />16. <br />Light Pole, Remove <br />15 <br />EA <br />650.00 <br />9,750.00 <br />17. <br />Pipe, Remove <br />4,585 <br />LFT <br />8.00 <br />36,680.00 <br />18. <br />Structures, Remove <br />28 <br />EA <br />600.00 <br />16,800.00 <br />19. <br />Fire Hydrant, Remove <br />6 <br />EA <br />1,250.00 <br />6,250.00 <br />20. <br />Concrete Curb, Remove <br />5,565 <br />LFT <br />4.00 <br />22,260.00 <br />21. <br />Concrete Approaches and Sidewalk, Remove <br />3,315 <br />SYD <br />8.00 <br />26,520.00 <br />22. lConcrete <br />Pavement, Remove <br />6,820 <br />SYD <br />10.00 <br />68,200.00 <br />23. <br />Brick, Remove and Salvage <br />1,345 <br />SYD <br />7.00 <br />9,415.00 <br />24. <br />Compacted Aggregate, No, 53 <br />5,110 <br />TON <br />38.00 <br />194,180.00 <br />25. <br />Item Omitted <br />26. 1 <br />HMA for Patching <br />10 <br />TON <br />412.50 <br />4,125.00 <br />27. IHMA <br />Surface, 9,5 mm - Type S, PG 70-22P <br />810 <br />TON <br />112.00 <br />90,720.00 <br />28. 1 <br />HMA intermediate, 12.5 mm - Type B, PG 64-22 <br />1,340 <br />TON <br />90.00 <br />120,600.00 <br />29. <br />HMA Base, 25 mm - Type B, PG 64-22 <br />3,200 <br />TON <br />75.00 <br />240,000.00 <br />30. <br />Tack Coat <br />2 <br />548.00 <br />1,479.60 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />