|
HRP Construction Inc.
<br />BIDIPROPOSAL CITY DF-SOM-REND.
<br />Addendum No.1
<br />68.
<br />Sleeve, 6"
<br />1
<br />EA
<br />1,500.00
<br />1,500.00
<br />69.
<br />Tapping Sleeve, 10"
<br />1
<br />EA
<br />10,000.00
<br />10,000.00
<br />70.
<br />Bend, 22.5 Degree, 8"
<br />5
<br />EA
<br />1,250.00
<br />6,250.00
<br />71.
<br />Bend, 45 Degree, 8"
<br />17
<br />EA
<br />1 1,500.00
<br />25,500.00
<br />72,
<br />Cross, 8"
<br />2
<br />EA
<br />3,500.00
<br />7,000.00
<br />73.
<br />Tee, 8"
<br />7
<br />EA
<br />1,800.00
<br />12,600.00
<br />74,
<br />Reducer, 8"4"
<br />11
<br />EA
<br />1,500.00
<br />16,500.00
<br />75.
<br />Cap, 6"
<br />2
<br />EA
<br />450.00
<br />900.00
<br />76.
<br />Fire Hydrant, Assembly
<br />6
<br />EA
<br />9,000.00
<br />54,000.00
<br />77.
<br />Adjust Valve to Grade
<br />1
<br />EA
<br />500.00
<br />500.00
<br />78.
<br />Adjust Casting to Grade
<br />26
<br />EA
<br />750.00
<br />19,500.00
<br />79.
<br />Replace and Adjust Casting to Grade
<br />3
<br />EA
<br />1,250.00
<br />3,750.00
<br />80.
<br />Constructing Sign, Wayfinding Sign, Undistributed
<br />20
<br />SFT
<br />200.00
<br />4,000.00
<br />81.
<br />Sheet Sign, 0.080 in.
<br />143
<br />SFT
<br />15.00
<br />2,145.00
<br />82.
<br />Sheet Sign, 0.125 in.
<br />39
<br />SFT
<br />19.00
<br />741.00
<br />83.
<br />Sign Post, Square, Type 2, Reinforced Anchor Base
<br />325
<br />LFT
<br />15.00
<br />4,875.00
<br />84.
<br />Sign Foundation, Type F2
<br />2
<br />EA
<br />4,000.00
<br />8,000.00
<br />86.
<br />Line, Thermoplastic, Solid, White, 4", Grooved
<br />1,200
<br />LFT
<br />1.55
<br />1,860.00
<br />86,
<br />Line, Thermoplastic, Solid, White, 6"
<br />540
<br />LFT
<br />1.25
<br />675.00
<br />87.
<br />Line, Thermoplastic, Solid, Yellow, 4", Grooved
<br />4,700
<br />LFT
<br />1.55
<br />7,285.00
<br />88,
<br />Line, Thermoplastic, Solid, Yellow, 8" Grooved
<br />110
<br />LFT
<br />3.25
<br />357.50
<br />89,
<br />Line, Thermoplastic, Solid, Yellow, 12", Transverse
<br />55
<br />LFT
<br />4.75
<br />261.25
<br />90.
<br />Line, Paint, Broken, Yellow, 4"
<br />2,550
<br />LFT
<br />0.95
<br />2,422,50'
<br />91.
<br />Transverse Line, Thermoplastic, White, 24", Stop Bar
<br />165
<br />LFT
<br />8.25
<br />1,361.25
<br />92.
<br />Transverse Line, Thermoplastic, White, 24", Crosswalk
<br />360
<br />LFT
<br />8.25
<br />2,970.00
<br />93.
<br />Pavement Message Marking, Thermoplastic, School
<br />3
<br />EA
<br />250.00
<br />750.00
<br />94.
<br />Pavement Message Marking, Multicomponent, Tabled Intersection
<br />12
<br />EA
<br />150.00
<br />1,800.00
<br />95.
<br />Pavement Message Marking, Multicomponent, Bike Symbol
<br />36
<br />EA
<br />150.00
<br />5,400.00
<br />96.
<br />Pavement Message Marking, Multicomponent, Pedestrian Symbol
<br />1 36
<br />EA
<br />150.00
<br />5,400.00
<br />97.
<br />Item Omitted
<br />98.
<br />4-11c No. 8 Copper Cable
<br />4,125
<br />1 LFT
<br />1 6.001
<br />24,750.00
<br />99.
<br />2" HDPE Schedule 80 for Lighting
<br />4,085
<br />1 LFT
<br />7.001
<br />28,595.00
<br />100.
<br />Item Omitted
<br />101.
<br />Light Pole Assembly, Type I and Foundation, Furnish and Install
<br />41
<br />EA
<br />8,700.00
<br />356,700.00
<br />102.
<br />Light Pole Assembly, Type 1, Furnish Only
<br />2
<br />EA
<br />7,100.00
<br />14,200.00
<br />103.
<br />Light Pole Assembly, Type 11 and Foundation, Furnish and Install
<br />16
<br />EA
<br />12,300.00
<br />196,800.00
<br />104.
<br />Light Pole Assembly, Type 11, Furnish Only
<br />2
<br />EA
<br />10,000.00
<br />20,000.00
<br />Version 0912912021 Contractor's Bid for Public Works - 9
<br />
|