Laserfiche WebLink
HRP Construction Inc. <br />BIDIPROPOSAL CITY DF-SOM-REND. <br />Addendum No.1 <br />68. <br />Sleeve, 6" <br />1 <br />EA <br />1,500.00 <br />1,500.00 <br />69. <br />Tapping Sleeve, 10" <br />1 <br />EA <br />10,000.00 <br />10,000.00 <br />70. <br />Bend, 22.5 Degree, 8" <br />5 <br />EA <br />1,250.00 <br />6,250.00 <br />71. <br />Bend, 45 Degree, 8" <br />17 <br />EA <br />1 1,500.00 <br />25,500.00 <br />72, <br />Cross, 8" <br />2 <br />EA <br />3,500.00 <br />7,000.00 <br />73. <br />Tee, 8" <br />7 <br />EA <br />1,800.00 <br />12,600.00 <br />74, <br />Reducer, 8"4" <br />11 <br />EA <br />1,500.00 <br />16,500.00 <br />75. <br />Cap, 6" <br />2 <br />EA <br />450.00 <br />900.00 <br />76. <br />Fire Hydrant, Assembly <br />6 <br />EA <br />9,000.00 <br />54,000.00 <br />77. <br />Adjust Valve to Grade <br />1 <br />EA <br />500.00 <br />500.00 <br />78. <br />Adjust Casting to Grade <br />26 <br />EA <br />750.00 <br />19,500.00 <br />79. <br />Replace and Adjust Casting to Grade <br />3 <br />EA <br />1,250.00 <br />3,750.00 <br />80. <br />Constructing Sign, Wayfinding Sign, Undistributed <br />20 <br />SFT <br />200.00 <br />4,000.00 <br />81. <br />Sheet Sign, 0.080 in. <br />143 <br />SFT <br />15.00 <br />2,145.00 <br />82. <br />Sheet Sign, 0.125 in. <br />39 <br />SFT <br />19.00 <br />741.00 <br />83. <br />Sign Post, Square, Type 2, Reinforced Anchor Base <br />325 <br />LFT <br />15.00 <br />4,875.00 <br />84. <br />Sign Foundation, Type F2 <br />2 <br />EA <br />4,000.00 <br />8,000.00 <br />86. <br />Line, Thermoplastic, Solid, White, 4", Grooved <br />1,200 <br />LFT <br />1.55 <br />1,860.00 <br />86, <br />Line, Thermoplastic, Solid, White, 6" <br />540 <br />LFT <br />1.25 <br />675.00 <br />87. <br />Line, Thermoplastic, Solid, Yellow, 4", Grooved <br />4,700 <br />LFT <br />1.55 <br />7,285.00 <br />88, <br />Line, Thermoplastic, Solid, Yellow, 8" Grooved <br />110 <br />LFT <br />3.25 <br />357.50 <br />89, <br />Line, Thermoplastic, Solid, Yellow, 12", Transverse <br />55 <br />LFT <br />4.75 <br />261.25 <br />90. <br />Line, Paint, Broken, Yellow, 4" <br />2,550 <br />LFT <br />0.95 <br />2,422,50' <br />91. <br />Transverse Line, Thermoplastic, White, 24", Stop Bar <br />165 <br />LFT <br />8.25 <br />1,361.25 <br />92. <br />Transverse Line, Thermoplastic, White, 24", Crosswalk <br />360 <br />LFT <br />8.25 <br />2,970.00 <br />93. <br />Pavement Message Marking, Thermoplastic, School <br />3 <br />EA <br />250.00 <br />750.00 <br />94. <br />Pavement Message Marking, Multicomponent, Tabled Intersection <br />12 <br />EA <br />150.00 <br />1,800.00 <br />95. <br />Pavement Message Marking, Multicomponent, Bike Symbol <br />36 <br />EA <br />150.00 <br />5,400.00 <br />96. <br />Pavement Message Marking, Multicomponent, Pedestrian Symbol <br />1 36 <br />EA <br />150.00 <br />5,400.00 <br />97. <br />Item Omitted <br />98. <br />4-11c No. 8 Copper Cable <br />4,125 <br />1 LFT <br />1 6.001 <br />24,750.00 <br />99. <br />2" HDPE Schedule 80 for Lighting <br />4,085 <br />1 LFT <br />7.001 <br />28,595.00 <br />100. <br />Item Omitted <br />101. <br />Light Pole Assembly, Type I and Foundation, Furnish and Install <br />41 <br />EA <br />8,700.00 <br />356,700.00 <br />102. <br />Light Pole Assembly, Type 1, Furnish Only <br />2 <br />EA <br />7,100.00 <br />14,200.00 <br />103. <br />Light Pole Assembly, Type 11 and Foundation, Furnish and Install <br />16 <br />EA <br />12,300.00 <br />196,800.00 <br />104. <br />Light Pole Assembly, Type 11, Furnish Only <br />2 <br />EA <br />10,000.00 <br />20,000.00 <br />Version 0912912021 Contractor's Bid for Public Works - 9 <br />