My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to OEW - Leeper Park Tennis Court – WBK Engineering LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to OEW - Leeper Park Tennis Court – WBK Engineering LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:57:49 PM
Creation date
3/26/2024 3:57:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Task 3 – 2024 Construction Support <br />This task includes review of shop drawings materials certifications and catalog cuts to ensure <br />compliance with the plans and specifications. Reviews will be coordinated to facilitate the <br />contractor’s construction schedule. Formal review and documentation will be provided to the <br />City for each submittal. <br />Also included is field support on concerns or interpretations through formal RFI and phone <br />conversations with City staff. No filed visits are anticipated. A total of 24 hours is anticipated <br />to include any sketches or formal responses as requested by the City for the project record. <br />The manhour estimate is a budgetary figure based on current knowledge and conditions at <br />each location. <br />Support for processing change orders and project close out are also included in the scope on a <br />limited basis. <br />Assumptions: <br />· No additional survey, field verification or field visits are included. <br />· No hazardous materials anticipated, and no evaluation or remediation included. <br />· No significant utility improvements are necessary other than those mentioned herein. <br />· No additional Geotech / pavement cores are necessary. <br />· Construction support is based on the manhours in the attached manhour estimate and <br />scope noted herein. <br />· Construction material testing is not included.
The URL can be used to link to this page
Your browser does not support the video tag.