Laserfiche WebLink
. <br />Description Principal Engineer V Engineer III <br />1 Data Collection & Primary Design Elements <br />1.1 Review Survey, Geotech, procure City Water main GIS 1 1 2 <br />1.2 Water main location, connections / City Coord (call City water)2 4 <br />1.3 Full removal and replacement - run prelim costs, underdrain layout 1 2 <br />1.4 Coord meeting with City for scope review 1 1 <br />SUB-TOTAL 15.0 1.0 5.0 9.0 <br />PERCENT 7%33%60% <br />2 Final Construction Documents <br />2.1 Final Bid Set <br />Covrer 1 <br />Notes 1 <br />Existing and proposed North w/ water main 2 8 <br />Existing and proposed South 1 6 <br />Details (3 sheets, incl WM details)1 6 <br />2.2 Specifications <br />Update prior 1 2 <br />Add WM 1 4 <br />Add Const & court specific recomemndations 2 2 <br />Qtys and Estimate 2 4 <br />2.3 Combine with Front end City Docs for complete Bid Package 1 4 <br />2.4 Bid Assistance 1 2 <br />2.5 QC Review and City staff review 1 2 4 <br />2.6 Permit 1 4 <br />SUB-TOTAL 64.0 1.0 15.0 48.0 <br />PERCENT 2%23%75% <br />3 Construction Support <br />3.1 Shop Drawings / Catalog Cut Review 2 8 <br />3.2 Field Support 2 4 <br />3.3 Change Orders 2 <br />3.4 Closeout 2 <br />SUB-TOTAL 20.0 4.0 16.0 <br />PERCENT 20%80% <br />TOTALS 99.0 2.0 24.0 73.0 <br />PERCENT 2%24%74% <br />Printed on 3/12/20243:02 PM 1 of 1 <br />EXHIBIT A <br />HOURS BY TASK <br />WORK HOUR ESTIMATE FOR CONSULTING SERVICES