My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:57:44 PM
Creation date
3/26/2024 3:57:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 <br />(Exhibit A-1 – Additional Services to be performed by Engineer) <br /> <br />Contractor to lead confined space entry process and provide safe access to <br />the structure for Engineer’s evaluation. <br />b) Engineer to evaluate only those portions of the structure that are dewatered <br />and exposed by Contractor. One day is provided for this inspection. <br />Subsequent visits to evaluate portions of the structure dewatered at a later <br />date will be considered additional services. <br />c) Engineer to prepare a report summarizing the results of the field <br />investigation. Subsequent structural design for structure rehabilitation once <br />the extents of rehabilitation are determined will be considered additional <br />services. <br />1.3 Conduct two review meetings with Owner and Contractor. <br />1.4 Provide technical criteria, written descriptions, and design data for Owner’s use <br />in filing applications for permit modifications from or approvals of governmental <br />authorities having jurisdiction to review or approve the final design of the Project; <br />assist Owner in consultations with such authorities; and revise the Drawings and <br />Specifications in response to directives from such authorities for the following: <br />a) IDEM Sanitary Sewer Construction Permit – permit modification <br />b) IDNR Construction in a Floodway – permit modification <br />1.5 Engineer’s services under the Value Engineering Phase will be considered <br />complete on the date when Owner and Contractor consider Value Engineering <br />Phase documents sufficiently complete to proceed with construction of the related <br />components and the permits in Paragraph A.1.4 have been issued to Owner. <br />E. Assumptions: <br />1. The Owner will provide the relevant information outlined above in a timely manner. <br />F. Deliverables: <br />1. Three hard copies and one electronic copy of the revised Value Engineering Phase <br />documents. <br />G. Schedule <br />The proposed Work will be completed within 120 days after receiving the Notice to Proceed (NTP) <br />from Owner. A breakdown of the preliminary schedule is as follow: <br />50% review meeting 45 days after NTP <br />75% complete documents submittal 75 days after 50% review meeting <br /> <br /> <br /> <br />DocuSign Envelope ID: 82FD47A1-B60F-4AA4-B32C-7DA1FD4E06C3
The URL can be used to link to this page
Your browser does not support the video tag.