My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:57:44 PM
Creation date
3/26/2024 3:57:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit C-1 – Compensation for Additional Services to be performed by Engineer) <br />3. Exhibit C-1, Compensation to Engineer for Additional Services and Reimbursable Expenses is <br />included in the Agreement, as follows: <br /> <br /> <br />This is EXHIBIT C-1, Compensation for Additional <br />Services to be performed by Engineer, consisting of two <br />pages, referred to in and part of the Agreement between <br />Owner and Engineer for Professional Services dated as of <br />the last required signature. <br /> <br />Payments to Engineer for Additional Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Additional Basic Services – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C-1.2.01 Compensation for Additional Services described in Exhibit A-1 – Lump Sum Method <br />of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services and Additional Services set forth in Exhibit A- <br />1 as follows: <br />1. A Lump Sum amount of $2,354,023.00 $3,419,123.00 based on the following <br />estimated distribution of compensation: <br />a. Study and Report Phase $265,235.00 <br />b. Preliminary Design Phase $1,114,384.50 <br />c. Final Design Phase $686,880.50 <br />d. Value Engineering Phase $298,000 <br />e. Bidding and Negotiating Phase $49,540.00 <br />f. Construction Phase (admin) $299,483.00 $418,283.00 <br />g. Construction Phase (RPR) $459,500.00 <br />h. Post-Construction Phase TBD $127,300.00 <br />2. The Lump Sum includes compensation for Engineer’s services and services of <br />Engineer’s Consultants, if any. Appropriate amounts have been incorporated in the <br />Lump Sum to account for labor, overhead, profit, and Reimbursable Expenses. <br />3. The portion of the Lump Sum amount billed for Engineer’s services will be based <br />upon Engineer’s estimate of the percentage of the total services actually completed <br />during the billing period. <br />DocuSign Envelope ID: 82FD47A1-B60F-4AA4-B32C-7DA1FD4E06C3
The URL can be used to link to this page
Your browser does not support the video tag.