My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:57:44 PM
Creation date
3/26/2024 3:57:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 <br />(Exhibit A-1 – Additional Services to be performed by Engineer) <br /> <br />2. Proposed diversion structure to be modified <br />3. Existing diversion structure to be retained, rehabilitated, and improved <br />4. Bypass sewer system to be modified <br />See Attachment 1 for Contractor’s GMAX Proposal letter, Exhibit A, Item 3 regarding Items 1. <br />through 4. above. <br />Engineer must modify the Contract Documents and permit applications to incorporate the above <br />concepts for Contractor to proceed with the related portions of the Project construction. <br /> <br />PART 2 – ADDITIONAL SERVICES <br />Value Engineering <br />A. Engineer’s proposed work is outlined as follows: <br />1.1 For the above Owner-accepted value engineering concepts, conduct additional <br />design and prepare the following revised final Drawings indicating the scope, <br />extent, and character of the Work to be performed and furnished by Contractor as <br />necessary for Contractor to execute the construction phase of the Guaranteed <br />Savings Contract. <br />a) Title Sheet <br />b) Index and General Information <br />c) Site Plan <br />d) Site Construction Details <br />e) Proposed Utility Plan <br />f) Proposed Grading Plans (Site and Spot Elevations) <br />g) Sanitary Sewer Plan and Profile Drawings <br />h) Existing CSO 045 Diversion Structure Improvements <br />i) Combined Diversion Structure and Lift Station Plan and Sections <br />j) Control Building Plan and Section <br />k) Structural Plans <br />l) Architectural Plans <br />m) Electrical Plans <br />n) Instrumentation and Control Plans <br />1.2 Evaluate the condition of the existing CSO 045 diversion structure as follows. <br />a) Contractor to supply scaffolding and confined space equipment. Engineer <br />to conduct a pre-investigation meeting with Contractor to develop access <br />plan plus confined space permit/safety plan and required formwork. <br />DocuSign Envelope ID: 82FD47A1-B60F-4AA4-B32C-7DA1FD4E06C3
The URL can be used to link to this page
Your browser does not support the video tag.