My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:57:44 PM
Creation date
3/26/2024 3:57:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br />(Exhibit A-1 – Additional Services to be performed by Engineer) <br /> <br />1.2 Modify Contract Drawings to reflect information contained in Contractor’s <br />annotated record drawings. <br />1.3 Provide draft record drawings for Owner’s review. <br />1.4 Revise record drawings in response to Owner’s comments. <br />1.5 Engineer’s services under the Post-Construction Phase will be considered <br />complete on the date when Owner accepts the record drawings. <br />B. Assumptions: <br />1. The Contractor will provide the relevant information outlined above in a timely <br />manner. <br />C. Deliverables: <br />1. Three hard copies and one electronic copy of the record plans. <br />D. Schedule <br />The proposed Work will be completed within 75 days after receiving the annotated record drawings <br />from Contractor. A breakdown of the preliminary schedule is as follow: <br />Draft record plans to Owner for review 50 days after receiving annotated drawings <br />Owner review 10 days <br />Final record plans to Owner 15 days after receiving Owner’s comments <br /> <br />1.2. Additional construction administration. <br />A. The proposed work is outlined as follows: <br />1.1 Conduct additional contractor coordination meetings. <br />1.2 Cost adjustment for hourly billing rate increases. <br /> <br />PART 2 – ADDITIONAL SERVICES <br /> <br />Value Engineering <br />CSO 045 EQ Basin at the WWTP <br />ADDITIONAL SERVICES by ENGINEER <br />The City of South Bend (Owner) entered into a Guaranteed Savings Contract (GSC) with <br />Contractor to construct the CSO 045 EQ Basin project at Owner’s Wastewater Treatment Plant <br />(WWTP). Contractor and Engineer proposed value engineering concepts to decrease the project <br />cost. Owner accepted the following value engineering concepts: <br />1. Lift station to be moved adjacent to proposed diversion structure <br />DocuSign Envelope ID: 82FD47A1-B60F-4AA4-B32C-7DA1FD4E06C3
The URL can be used to link to this page
Your browser does not support the video tag.