My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to OEA - WWTP CSO Storage Tank Proj No. 121-071 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:57:44 PM
Creation date
3/26/2024 3:57:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit A-1 – Additional Services to be performed by Engineer) <br /> <br />This is Attachment 1, consisting of six pages, to <br />Amendment No. 3. <br /> <br />Modifications <br /> <br />1. Amendment No. 3, as set forth below, contemplates additional services to be performed by Engineer <br />and the respective fee. The total compensation due to Engineer under the Agreement, Amendment <br />No. 1, Amendment No. 2, and Amendment No. 3 is $3,419,123.00, an increase of $1,003,600.00. <br /> <br />2. Exhibit A-1, Engineer’s Services, contemplating additional services to be performed by Engineer, <br />is included in the Agreement, as follows: <br /> <br /> <br />This is EXHIBIT A-1, Additional Services to be <br />performed by Engineer, consisting of four pages, referred <br />to in and part of the Agreement between Owner and <br />Engineer for Professional Services dated as of the last <br />required signature. <br />Engineer’s Services <br /> <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />Engineer shall provide the Additional Basic Services and Additional Services as set forth below. <br /> <br />PART 1 – BASIC SERVICES <br /> <br />Record Drawings <br />CSO 045 EQ Basin at the WWTP <br />ADDITIONAL SERVICES by ENGINEER <br />The City of South Bend (Owner) entered into a Guaranteed Savings Contract (GSC) with <br />Contractor to construct the CSO 045 EQ Basin project at Owner’s Wastewater Treatment Plant <br />(WWTP). Contractor and Engineer proposed value engineering concepts to decrease the project <br />cost, which significantly impacts the Contract Drawings. Engineer must modify the Contract <br />Drawings along with all other Drawings to reflect the as-built conditions after construction has <br />concluded. <br /> <br />PART 1 – BASIC SERVICES <br />1.1. Preparation of record drawings <br />A. The proposed work is outlined as follows: <br />1.1 Collect annotated record drawings from Contractor that contain as-built <br />information. <br />DocuSign Envelope ID: 82FD47A1-B60F-4AA4-B32C-7DA1FD4E06C3
The URL can be used to link to this page
Your browser does not support the video tag.