Laserfiche WebLink
<br />2019, 2023 Musco Sports Lighting, LLC Date: Jan. 12, 2024 Project #231697, Page 1 of 4 <br /> M-3219-en04-10 <br />Quote Scope of Work: Light-Structure System™ - Pole in the Air <br />Martin Luther King JR. Dream Center Basketball Courts <br />South Bend, IN <br />Pole in the Air Scope of Work <br /> <br />Customer/Electrical Contractor Responsibilities <br />General: <br />1. Complete access to the site for construction utilizing 2 -wheel drive rubber tire equipment. <br />2. Locate existing underground utilities not covered by your local utilities. (i.e., water lines, electrical <br />lines, irrigation systems, and sprinkler heads). Musco or Subcontractor will not be responsible for <br />repairs to unmarked utilities. <br />3. Locate and mark field reference points per Musco supplied layout. (i.e. home plate, center of FB field) <br />4. Pay for extra costs associated with foundation excavation in non-standard soils (rock, caliche, high <br />water table, collapsing holes, etc.) or soils not defined in geo-technical report. Standard soils are <br />defined as soils that can be excavated using standard earth auguring equipment. <br />5. Pay any power company fees and requirements. <br />6. Pay all permitting fees and obtain the required electrical permitting. <br />7. Provide area on site for disposal of spoils from foundation excavation. <br />8. Responsible for restoration of the site. <br />9. Provide on-site dumpster(s). <br />Electrical: <br />1. Provide materials and equipment to reuse existing 208V/3P electrical service panel as required. <br />2. Provide materials and equipment to install all underground conduit, wiring, pull boxes, etc. and <br />terminate wiring as required. <br />3. Provide as-built drawings upon completion of installation, if required. <br />Control-Link Control and Monitoring: <br />1. Provide labor, equipment, and materials to install (1) 24” x 48” Musco control and monitoring cabinet <br />and terminate all necessary wiring. <br />2. Provide a dedicated 120 V 20 A controls circuit or a step-down transformer for 120 V control circuit if <br />not available. <br />3. Check all zones to make sure they work in both auto and manual mode. <br />4. Commission Control-Link® by contacting Control-Link Central™ at 877-347-3319. <br />1. Land customer provided DMX cable in control and monitoring cabinet on DMX512 input terminals. <br />2. Check all zones to make sure they work in both auto and manual mode. <br />3. Commission Control-Link® by contacting Control-Link Central™ at 877-347-3319. <br />Musco Responsibilities: <br />1. Provide required foundations, poles, electrical enclosures, wire harnesses, fixtures , and control <br />cabinets. <br />2. Provide layout of pole locations and aiming diagram. <br />3. Provide foundation and pole-assembly drawing (CIS) based on soils that meet or exceed those of a <br />Class 5 material as defined by 2018 IBC Table 1806.2. A stamped foundation design will only be <br />provided if a Geotech report is made available. <br />4. Provide Contract Management as required. <br />5. Assist our installing subcontractor and ensure our responsibilities are satisfied. <br /> <br /> <br />DocuSign Envelope ID: 77150BD8-9635-4710-AF60-406232008C44