My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - MLK Jr. Dream Center Proj No. 121-066 - C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Change Orders
>
Change Order No 3 - MLK Jr. Dream Center Proj No. 121-066 - C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 3:52:14 PM
Creation date
3/26/2024 3:52:02 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2019, 2023 Musco Sports Lighting, LLC Date: Jan. 12, 2024 Project #231697, Page 2 of 4 <br /> M-3219-en04-10 <br />Quote Scope of Work: Light-Structure Systemâ„¢ - Pole in the Air <br />Subcontractor Responsibilities (Custer Electric) <br />General: <br />1. Obtain any required permitting. <br />2. Contact 811 for locating underground public utilities and then confirm they have been clearly marked. <br />3. Contact the facility owner/manager to confirm the existing private underground utilities and irrigation <br />systems have been located and are clearly marked to avoid damage from construction equipment. <br />Notify owner and repair damage to marked utilities. Notify owner and Musco regarding damage which <br />occurred to unmarked utilities. <br />4. Provide labor, equipment, and materials to off load equipment at jobsite per scheduled delivery. <br />Control and monitoring cabinets will need to be given to on-site customer representative. <br />5. Provide storage containers for materials (including electrical components enclosures) as needed. <br />6. Provide necessary waste disposal and daily cleanup. <br />7. Provide adequate security to protect Musco delivered products from theft, vandalism, or damage <br />during the installation. <br />8. Keep all heavy equipment off playing fields when possible. <br />9. Installation to commence upon delivery and proceed without interruption until complete. Notify Musco <br />immediately of any breaks in schedule or delays. <br />Foundations, Poles, and Luminaires: <br />1. Mark and confirm pole locations per the aiming drawing provided. If there are any issues, immediately <br />notify your Musco Project Manager. <br />2. Provide labor, materials, and equipment to install (4) LSS foundations as specified on Layout and per <br />the stamped foundation drawings, if applicable. <br />3. Remove spoils to owner designated location at jobsite OR dispose of offsite. <br />4. Provide labor, materials, and equipment to assemble Musco TLC-LED fixtures, electrical enclosures, <br />poles, and pole harnesses. <br />5. Provide labor, equipment, and materials to erect dressed (4) LSS Poles and aim utilizing the pole <br />alignment beam. <br /> <br />DocuSign Envelope ID: 77150BD8-9635-4710-AF60-406232008C44
The URL can be used to link to this page
Your browser does not support the video tag.