Laserfiche WebLink
<br />2016, 2023 Musco Sports Lighting, LLC - 1 - M-2038-enUS-13 <br /> <br />Quote Quote <br />Date: Jan. 12, 2024 Project: MLK Dream Center Basketball Courts <br />Exp. Date: Feb. 11, 2024 South Bend, IN <br /> Musco Project Number: 231697 <br /> <br />Quotation Price – Materials Delivered to Job Site & Pole-in-Air Installation <br />TLC for LED™ Basketball Lighting w/ Control-Link® & Pole-in-Air Installation ........................ $69,500.00 <br /> <br />Sales tax, bonding, and electrical installation are not included. <br />Quote is confidential. Pricing and lead times are effective for 30 days only. <br /> <br />Light-Structure System™ with Total Light Control – TLC for LED™ technology <br />Guaranteed Lighting Performance <br />• Guaranteed light levels and uniformities for each basketball court as noted below <br />o Basketball 1 (85’x50’): 20fc, 3:1 <br />o Basketball 2 (85’x50’): 20fc, 3:1 <br />System Description <br />• Factory aimed and assembled luminaries <br />• Galvanized steel poles <br />• Pre-cast concrete bases with integrated lightning grounding <br />• Pole length factory assembled wire harnesses <br />• Factory wired and tested remote electrical component enclosures <br />• UL listed assemblies <br />Control Systems and Services <br />• Control-Link® control and monitoring system to provide remote on/off and dimming (high/medium/low) control and <br />performance monitoring with 24/7 customer support <br />Operation and Warranty Services <br />• Product assurance and warranty program that covers materials and onsite labor, eliminating 100% of your maintenance costs <br />for 25 years <br />• Support from Musco’s Lighting Services Team – over 170 Team members dedicated to operating and maintaining your lighting <br />system – plus a network of 1800+ contractors <br /> <br />Payment Terms <br />Final payment terms are subject to approval by Musco credit department. Final payment shall not be withheld by Buyer on account of <br />delays beyond the control of Musco. <br /> <br />Delivery Timing <br />10-12 weeks for delivery of materials to the job site from the time of order, submittal approval, and confirmation of order details <br />including voltage, phase, and pole/luminaire locations. <br /> <br />Notes <br />Quote is based on following conditions: <br />• Shipment of entire project together to one location. <br />• 208 Volt, 3 phase electrical system requirement. <br />• Structural code and wind speed = 2012 IBC, 115 mi/h, Exposure C, Importance Factor 1.0. <br />• Due to the built-in custom light control per luminaire, pole or luminaire locations need to be confirmed prior to production. Changes <br />to pole or luminaire locations after the product is sent to production could result in additional charges. <br />• Standard soil conditions – rock, bottomless, wet, or unsuitable soil may require additional engineering, special installation methods <br />and additional cost. <br /> <br />Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional details. <br /> <br />Brent Castle <br />Field Sales Representative <br />Musco Sports Lighting, LLC <br />Phone: (317) 617-3992 <br />E-mail: brent.castle@musco.com <br /> <br />DocuSign Envelope ID: 77150BD8-9635-4710-AF60-406232008C44