Laserfiche WebLink
315 West Jefferson Boulevard, South Bend, IN 46601 • 574.232.8700 abonmarche.com Engineering • Architecture • Land Surveying March 14, 2024 Ms. Charlotte Brach, P.E. Assistant City Engineer City of South Bend 227 W Jefferson, Ste 1316 South Bend, IN 46601 Re: DTSB to ND Trail, Notre Dame Avenue City Project No. 122-040A Bid Tab and Letter of Recommendation Charlie, Please find attached a copy of the bid tabulation sheet for the referenced project. No apparent errors or anomalies were discovered in review of the bids. Three bids were received for the work and each appear to be from a responsive bidder. Two of the bids received for the base bid were under the Engineer’s Estimate. One of the bids received for the sewer lining was below the Engineer’s Estimate. The lowest bid is dependant upon the award of the sewer lining. Below is a summary of the bids received: If the sewer lining is within the acceptable budget, we recommend award of the contract to Milestone Contractor North. If the additional cost for the sewer lining is not feasible, we recommend award of the contract to Rieth-Riley Construction. Sincerely, Abonmarche Consultants, Inc Chad Knip Project Manager Bid Tab SummaryEngineer's Estimate Milestone Contractors North Rieth-Riley Construction HRP Construction$5,177,405.00 $4,885,192.50 $4,830,902.99 $6,665,000.00$5,256,255.00 $4,910,277.50 $4,855,987.99 $6,690,185.00$5,677,905.00 $5,334,217.50 $5,787,482.70 $7,119,950.00$5,450,155.00 $5,112,792.50 $5,439,953.60 $6,909,525.00$6,009,505.00 $5,579,902.50 $6,414,618.31 $7,382,460.00Base Bid + Add Alt A + Add Alt C + Add Alt D(Base + Sewer Lining, ND Ave + Brick Palletization + Fiber Optic)Base Bid + Add Alt B + Add Alt C + Add Alt D (Base + Brick Palletization + Sewer Lining, Hill/SB Ave + Fiber OpticBase Bid + Add Alt C + Add Alt D (Base + Brick Palletization + Fiber Optic)Base Bid + Add Alt A + Add Alt B + Add Alt C + Add Alt D (Base + Sewer Lining, ND Ave + Brick Palletization + Sewer Lining, Hill/SB Ave + Fiber Optic)Base Bid