BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: 2024 Comm unitv Crossinas
<br />5
<br />Asphalt for Tack Coat
<br />5
<br />TON
<br />$650.00
<br />$3,250.00
<br />6
<br />Joint Adhesive, Surface
<br />2293
<br />LFT
<br />$0.60
<br />$1,375.80
<br />7
<br />Joint Adhesive, Intermediate
<br />2293
<br />LFT
<br />$0.65
<br />$1,490.45
<br />8
<br />Sidewalk, Concrete
<br />4550
<br />SYS
<br />$142.00
<br />$7,668.00
<br />9
<br />Curb Ramp, Concrete
<br />�
<br />SYS
<br />$340.00
<br />$10,540.00
<br />4-0
<br />DeteGtable WaFRiRg S srfaGe
<br />32-5
<br />dtd
<br />$0.00
<br />$0.00
<br />11
<br />Curb, Concrete
<br />,420
<br />LFT
<br />$67.60
<br />$97,006.00
<br />12
<br />Line, Thermoplastic, Solid, Yellow,
<br />2930
<br />LFT
<br />$0.58
<br />$1,699.40
<br />4 IN.
<br />13
<br />Line,
<br />e, Thermoplastic, Solid, White, 4
<br />4020
<br />LFT
<br />$0.58
<br />$2,331.60
<br />14
<br />Transverse Marking,
<br />Thermoplastic, Stop Line, 24 IN.
<br />72
<br />LFT
<br />$13.07
<br />$941.04
<br />Transverse Marking,
<br />15
<br />Thermoplastic, Crosswalk Line,
<br />450
<br />LFT
<br />$2.24
<br />$1,008.00
<br />White, 6 IN.
<br />Pavement Message Marking,
<br />16
<br />Thermoplastic, Lane Indication
<br />3
<br />EA
<br />$203.00
<br />$609.00
<br />Arrow
<br />Pavement Message Marking,
<br />17
<br />Thermoplastic, Bike and Arrow
<br />17
<br />EA
<br />$607.00
<br />$10,319.00
<br />Symbol
<br />18
<br />Grooving for Pavement Markings
<br />6950
<br />LFT
<br />$0.52
<br />$3,614.00
<br />19
<br />Detector Housing, Replace
<br />1
<br />EA
<br />$1,700.00
<br />$1,700.00
<br />20
<br />Pedestrian Push Button Pole,
<br />Pedestal, 12 FT.
<br />4
<br />EA
<br />$1,400.00
<br />$5,600.00
<br />21
<br />Pedestal Foundation, A, 24 IN. X 24
<br />4
<br />$1,100.00
<br />$4,400.00
<br />IN. X 36 IN.
<br />EA
<br />Pedestrian Signal Head,
<br />22
<br />International Symbol, 18 IN., with
<br />4
<br />EA
<br />$819.00
<br />$3,276.00
<br />Countdown
<br />23
<br />Pedestrian Push Button & Sign
<br />R10-8 & APS Audible Conformation
<br />12
<br />EA
<br />$1,600.00
<br />$19,200.00
<br />24
<br />Conduit, HDPE SCH. 80, 2 IN.
<br />300
<br />LFT
<br />$32.00
<br />$9,600.00
<br />25
<br />Conduit, PVC SCH. 40, 2 IN.
<br />100
<br />LFT
<br />$17.00
<br />$1,700.00
<br />26
<br />Signal Cable, Control, Copper,
<br />5C/14 GA
<br />300
<br />LFT
<br />$4.50
<br />$1,350.00
<br />27
<br />Handhole, Adjust to Grade
<br />2
<br />EA
<br />$400.00
<br />$800.00
<br />28
<br />Manhole, Structure Adjustment
<br />3
<br />EA
<br />$531.00
<br />$1,593.00
<br />29
<br />Inlet, Structure Adjustment
<br />2
<br />EA
<br />$531.00
<br />$1,062.00
<br />30
<br />Water Valve, Structure Adjustment
<br />4
<br />EA
<br />$350.00
<br />$1,400.00
<br />31
<br />Maintenace of Traffic
<br />1
<br />LS
<br />$16,619.72
<br />$16,619.72
<br />Version 09/29/2021 Special Provisions - 8
<br />
|