JJjj.. ✓
<br />BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name:
<br />32 1 Mobilization
<br />2024 Community Crossings
<br />and Demobilization
<br />LS
<br />2,779.12 1$22, 779.12
<br />2024 COMMUNITY CROSSINGS
<br />DIVISION 4: MEADE STREET (FROM ECLIPSE PL. TO ORANGE ST_1
<br />ITEM
<br />NO.
<br />DESCRIPTION
<br />QUANTITY
<br />UNIT
<br />UNIT PRICE
<br />TOTAL AMOUNT
<br />1
<br />HMA Surface, Type B
<br />682
<br />TON
<br />$91.00
<br />$62,062.00
<br />2
<br />HMA Intermediate, Type B
<br />1137
<br />TON
<br />$72.75
<br />$82,716.75
<br />3
<br />Milling, Asphalt, 4 IN.
<br />8269
<br />SYS
<br />$3.83
<br />$31,670.27
<br />4
<br />for Patching, Full Depth, Type
<br />14
<br />TON
<br />$91.00
<br />$1,274.00
<br />BHMA
<br />5
<br />Asphalt for Tack Coat
<br />3
<br />TON
<br />$650.00
<br />$1,950.00
<br />6
<br />Joint Adhesive, Surface
<br />1856
<br />LFT
<br />$0.60
<br />$1,113.60
<br />7
<br />Joint Adhesive, Intermediate
<br />1856
<br />LFT
<br />�$0.65
<br />$1,206.40
<br />8
<br />Sidewalk, Concrete
<br />340
<br />49
<br />SYS
<br />$142.00
<br />$6,958.00
<br />9
<br />Curb Ramp, Concrete
<br />94-0
<br />98
<br />SYS
<br />$340.00
<br />$33,320.00
<br />-rat
<br />D'eteG'table WaFRiRg S s
<br />32
<br />SYS
<br />$0.00
<br />$0.00
<br />ee
<br />11
<br />Curb, Concrete
<br />�
<br />LFT
<br />$67.60
<br />$20,618.00
<br />12
<br />Line,
<br />e, Thermoplastic, Solid, White, 4
<br />3233
<br />LFT
<br />$0.58
<br />$1,875.14
<br />13
<br />Transverse Marking,
<br />Thermoplastic, Stop Line, 24 IN.
<br />74
<br />LFT
<br />$13.07
<br />$967.18
<br />Transverse Marking,
<br />14
<br />Thermoplastic, Crosswalk Line,
<br />435
<br />LFT
<br />$2.24
<br />$974.40
<br />White, 6 IN.
<br />Pavement Message Marking,
<br />15
<br />Thermoplastic, Lane Indication
<br />2
<br />EA
<br />$203.00
<br />$406.00
<br />Arrow
<br />16
<br />Pavement Message Marking,
<br />1
<br />EA
<br />$989.00
<br />$989.00
<br />Thermoplastic, Railroad Crossing
<br />Pavement Message Marking,
<br />17
<br />Thermoplastic, Bike and Arrow
<br />18
<br />EA
<br />$607.00
<br />$10,926.00
<br />Symbol
<br />18
<br />Grooving for Pavement Markings
<br />3458
<br />LFT
<br />$0.52
<br />$1,798.16
<br />19
<br />Manhole, Structure Adjustment
<br />4
<br />EA
<br />$531.00
<br />$2,124.00
<br />20
<br />Inlet, Structure Adjustment
<br />2
<br />EA
<br />$531.00
<br />$1,062.00
<br />21
<br />Water Valve, Structure Adjustment
<br />3
<br />EA
<br />$350.00
<br />$1,050.00
<br />Version 09/29/2021 Special Provisions - 9
<br />
|