Laserfiche WebLink
JJjj.. ✓ <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: <br />32 1 Mobilization <br />2024 Community Crossings <br />and Demobilization <br />LS <br />2,779.12 1$22, 779.12 <br />2024 COMMUNITY CROSSINGS <br />DIVISION 4: MEADE STREET (FROM ECLIPSE PL. TO ORANGE ST_1 <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />1 <br />HMA Surface, Type B <br />682 <br />TON <br />$91.00 <br />$62,062.00 <br />2 <br />HMA Intermediate, Type B <br />1137 <br />TON <br />$72.75 <br />$82,716.75 <br />3 <br />Milling, Asphalt, 4 IN. <br />8269 <br />SYS <br />$3.83 <br />$31,670.27 <br />4 <br />for Patching, Full Depth, Type <br />14 <br />TON <br />$91.00 <br />$1,274.00 <br />BHMA <br />5 <br />Asphalt for Tack Coat <br />3 <br />TON <br />$650.00 <br />$1,950.00 <br />6 <br />Joint Adhesive, Surface <br />1856 <br />LFT <br />$0.60 <br />$1,113.60 <br />7 <br />Joint Adhesive, Intermediate <br />1856 <br />LFT <br />�$0.65 <br />$1,206.40 <br />8 <br />Sidewalk, Concrete <br />340 <br />49 <br />SYS <br />$142.00 <br />$6,958.00 <br />9 <br />Curb Ramp, Concrete <br />94-0 <br />98 <br />SYS <br />$340.00 <br />$33,320.00 <br />-rat <br />D'eteG'table WaFRiRg S s <br />32 <br />SYS <br />$0.00 <br />$0.00 <br />ee <br />11 <br />Curb, Concrete <br />� <br />LFT <br />$67.60 <br />$20,618.00 <br />12 <br />Line, <br />e, Thermoplastic, Solid, White, 4 <br />3233 <br />LFT <br />$0.58 <br />$1,875.14 <br />13 <br />Transverse Marking, <br />Thermoplastic, Stop Line, 24 IN. <br />74 <br />LFT <br />$13.07 <br />$967.18 <br />Transverse Marking, <br />14 <br />Thermoplastic, Crosswalk Line, <br />435 <br />LFT <br />$2.24 <br />$974.40 <br />White, 6 IN. <br />Pavement Message Marking, <br />15 <br />Thermoplastic, Lane Indication <br />2 <br />EA <br />$203.00 <br />$406.00 <br />Arrow <br />16 <br />Pavement Message Marking, <br />1 <br />EA <br />$989.00 <br />$989.00 <br />Thermoplastic, Railroad Crossing <br />Pavement Message Marking, <br />17 <br />Thermoplastic, Bike and Arrow <br />18 <br />EA <br />$607.00 <br />$10,926.00 <br />Symbol <br />18 <br />Grooving for Pavement Markings <br />3458 <br />LFT <br />$0.52 <br />$1,798.16 <br />19 <br />Manhole, Structure Adjustment <br />4 <br />EA <br />$531.00 <br />$2,124.00 <br />20 <br />Inlet, Structure Adjustment <br />2 <br />EA <br />$531.00 <br />$1,062.00 <br />21 <br />Water Valve, Structure Adjustment <br />3 <br />EA <br />$350.00 <br />$1,050.00 <br />Version 09/29/2021 Special Provisions - 9 <br />