Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: <br />2024 Community Crossings <br />`4 ? <br />Project Number: <br />124-006 <br />For Bids Due: <br />March 26, 2024, 9:00 a.m., Local Time <br />Contractor Name: <br />Rieth-Riley Construction Co., Inc. <br />25 <br />Signal Pole, Pedestal, 12 FT. <br />6 <br />EA <br />$1,400.00 <br />$8,400.00 <br />26 <br />Signal Pole Foundation <br />6 <br />EA <br />$1,100.00 <br />$6,600.00 <br />27 <br />Pedestrian Signal Head, <br />Countdown, 18 IN. <br />8 <br />EA <br />$819.00 <br />$6,552.00 <br />28 <br />Pedestrian Push Button, APS <br />8 <br />EA <br />$1,400.00 <br />$11,200.00 <br />29 <br />Adjustable Bracket Extension <br />2 <br />EA <br />$250.00 <br />$500.00 <br />30 <br />Conduit, HDPE SCH. 80, 2 IN. <br />100 <br />LFT <br />$32.00 <br />$3,200.00 <br />31 <br />Conduit, PVC SCH. 40, 2 IN. <br />60 <br />LFT <br />$17.00 <br />$1,020.00 <br />32 <br />Signal Cable, Control, Copper, <br />3C/14 GA <br />1100 <br />LFT <br />$4.00 <br />$4,400.00 <br />33 <br />Signal Cable, Control, Copper, <br />5C/14 GA <br />1100 <br />LFT <br />$4.50 <br />$4,950.00 <br />34 <br />Handhole, Adjust to Grade <br />2 <br />EA <br />$400.00 <br />$800.00 <br />35 <br />Traffic Signal Equipment, Remove <br />1 <br />EA <br />$700.00 <br />$700.00 <br />36 <br />Maintenance of Traffic <br />1 <br />LS <br />$57,424.23 <br />$57,424.23 <br />37 <br />Mobilization and Demobilization <br />1 <br />LS <br />$56,762.82 <br />$56,762.82 <br />DIVISION 1 TOTAL <br />$787,013.03 <br />2024 COMMUNITY CROSSINGS <br />DIVISION 3: BENDIX DRIVE (FROM WESTMOOR ST. TO ECLIPSE PL1 <br />ITEM <br />NO. <br />DESCRIPTION <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />TOTAL AMOUNT <br />1 <br />HMA Surface, Type B <br />1176 <br />TON <br />$91.00 <br />$107,016.00 <br />2 <br />HMA Intermediate, Type B <br />1961 <br />TON <br />$72.75 <br />$142,662.75 <br />3 <br />Milling, Asphalt, 4 IN. <br />14258 <br />SYS <br />$3.83 <br />$54,608.14 <br />4 <br />BHMA for Patching, Full Depth, Type <br />24 <br />TON <br />91.00 <br />$2,184.00 <br />Version 09/29/2021 Special Provisions - 7 <br />