My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Planning Market District Improvements Proj No. 123-053 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Planning Market District Improvements Proj No. 123-053 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:11:19 PM
Creation date
2/13/2024 3:39:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A. Reconnaissance and Planning <br />1. Upon receiving authorization to proceed, Rii will retain a permit for soil <br />borings within the right-of-way from the City of South Bend and/or St. Joseph <br />County, as applicable. <br />2. A representative from Rii will perform site reconnaissance and mark all boring <br />and pavement core locations in the field. The borings will be marked using <br />white ribbon on wood lath or white paint in the pavement. During the field <br />reconnaissance, the geotechnical engineer will document site geological <br />conditions and map all boring locations. Rii utilizes a handheld GPS unit <br />delivering sub -foot accuracy to locate soil borings. GPS coordinates of the <br />boring locations will be acquired during field reconnaissance, along with the <br />established project benchmarks. If benchmarks are not available, Rii will <br />establish reference points at the site. <br />3. Rii will contact Indiana 811 at least 48 hours prior to drilling, as a standard <br />precautionary measure for locating site utilities. It is requested that ASI or the <br />City of South Bend supply to Rii any utility information they may have with <br />respect to the proposed boring locations. <br />4. It is considered that the boring locations will be accessible to a truck or <br />all -terrain vehicle (ATV) mounted drill rig, and that most of the boring / core <br />locations will be located within existing right-of-way. However, within the <br />limits of pavement improvements near South Bend Farmer's Market, access <br />to private properties will be needed. As such, time has been allotted to <br />prepare and distribute property owner notification letters to all entities that will <br />be impacted by the geotechnical operations. <br />B. Field Program <br />1. A drilling program was requested by ASI, consisting of a total of thirteen (13) <br />roadway borings, designated as RB-1 through RB-13, within the project <br />limits, along various roadway alignments, extending to depths varying from <br />15.0 to 20.0 feet below the existing grade. Please note that, since the <br />proposed roadway improvements were unknown at the time of preparation of <br />this proposal, roadway boring depths may be deeper than typical IGM <br />requirements. <br />Actual boring depths will depend on the conditions of the soil encountered. <br />For the purpose of this proposal, a total drilling depth of 210.0 feet of soil <br />sampling and no rock has been estimated. <br />American Structurepoint, Inc. Resource International, Inc. <br />South Bend Market District Improvements Engineering Consultants 11 <br />City of South Bend, Indiana 2 Rii Proposal No. 23-1086 11/07/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.