Laserfiche WebLink
b. Asbestos inspections required with any building, bridge, etc. are not included in this <br />proposal. <br />c. A Phase II Environmental Site Assessment (RMR Investigation) and/or remediation <br />activities on any parcels are not included in this proposal. <br />d. Additional Public Involvement activities beyond what are mentioned in this proposal <br />are not included in this proposal. <br />e. Or any other environmental study not included in this proposal. <br />4. Traffic Analysis <br />a. Traffic counts and capacity analysis for additional intersections <br />b. Traffic Signal warrant analysis <br />c. Sub -area travel demand modeling using MACOG regional model for the proposed <br />roadway network. <br />d. Traffic forecasting for additional years beyond that identified in this scope. <br />e. Micro -simulation model development with 2D/3D video rendering <br />5. Bridge Services <br />a. Rehabilitation design or structural analysis of any railroad bridge or bridge beyond the <br />project limits. <br />b. Design of a bridge replacement or new bridge. <br />c. Structure Size and Type analysis. <br />d. Stage 2 design or plans. <br />e. Evaluation or design of any bridge not specifically identified. <br />f. Hydraulic or scour analysis of the St. Joseph River or Bowman Creek. <br />g. Historic Bridge Alternatives Analysis. <br />h. Substructure rehabilitation design. <br />i. Superstructure rehabilitation design or than to remove SR 23 Ramp over South Bank of <br />St. Joseph River. <br />j. Non-destructive testing of the existing structures. <br />k. Final Load Rating. <br />Page 12 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />