Laserfiche WebLink
6. Roadway Services. <br />a. Intersection Details <br />b. Driveway Details <br />c. Traffic Control <br />d. Lighting Plans <br />e. Signal Plans <br />f. Subsurface Utility Exploration <br />PART 2 — SCHEDULE <br />A2.01 Project Schedule <br />A. All services by the Engineer under this agreement shall be completed and delivered to the Owner <br />for review and approval within the following approximate time periods, exclusive of Owner's <br />review time. <br />B. Environmental Services <br />1. The Engineer will prepare an Environmental Constraints Report within 12 months of <br />Notice to Proceed. <br />2. The Engineer will prepare a Draft Purpose and Need Statement within 18 months of Notice <br />to Proceed. <br />3. The Engineer will submit the Final PEL Document by March 1, 2026. <br />C. Roadway and Bridge Design <br />1. Engineering Assessment Report within 12 months from Notice to Proceed. <br />2. Stage 1 Plans for Phase 1 complete by March 1, 2026. <br />Page 13 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />