My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Planning Market District Improvements Proj No. 123-053 – American Structurepoint, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2024
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Planning Market District Improvements Proj No. 123-053 – American Structurepoint, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 4:11:19 PM
Creation date
2/13/2024 3:39:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11. Develop a traffic study report that summarizes the analysis results and incorporates <br />roadway recommendations to accommodate the new traffic patterns. <br />12. Attend one (1) review meeting to discuss the preliminary traffic study findings and <br />recommendations, and up to four (4) progress meetings with the City of one hour each. All <br />meetings will be held virtually through video/audio teleconference calls. Additionally, it is <br />anticipated that traffic staff will present final recommendations to the City at one (1) in <br />person meeting. <br />A1.04 Preliminary Engineering Phase <br />A. Survey Services <br />1. When directed, the CONSULTANT shall survey the project location. The <br />CONSULTANT's work shall be in accordance with I.C. 25-21.5; 865 I.A.C. 1-12; and the <br />INDOT Design Manual (IDM) which is available online on the INDOT website, and which <br />is incorporated by reference. If there is any conflict between I.C. 25-21.59 865 I.A.C. 1-12, <br />or the INDOT Design Manual, the order of precedence shall be: <br />a. 1. I.C. 25-21.5 <br />b. 2. 865 I.A.C. 1-12 <br />c. 3. INDOT Design Manual <br />2. Survey Limits: <br />a. Survey limits are shown in Attachment 1 <br />3. Phase 1 - Topographic Route Survey including the following: <br />a. Survey crews shall have unrestricted access to project limits <br />b. Establish horizontal control (INGCS St Joseph) <br />c. Establish vertical control (NAVD 1988) <br />1) Set temporary benchmarks on site for use during construction <br />d. Select topographic survey with 50-foot grid <br />1) Show spot elevations to the nearest 0.01 foot <br />2) Provide the location, size and elevation of all improvements within the survey <br />limits <br />3) Plot the location of storm drainage structures, sanitary structures, roads, driveways, <br />edges of curbs, parking areas, walks, edge of water, drainage ways, fencing, etc. <br />4) Provide the location and size of individual trees outside of wooded areas larger than <br />8" DBH within the survey limits <br />Page 6 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.