Laserfiche WebLink
5) Plot the location of the drip line of all groups of tree and vegetation where locating <br />individual trees is not feasible <br />e. Provide location, size, depth, material and direction of flow for sanitary and storm <br />sewers serving or on the site <br />f. Locate aboveground evidence of utilities on site, plus marks made on the ground by <br />local utility companies (One Call). One Call will only locate utilities within the public <br />right-of-way or within recorded easements <br />g. CAD Drafting and creation of a TIN and contours (1-foot contour interval) <br />h. Land Surveyor review and deed and right-of-way plot based on limited fieldwork and <br />research obtained from the County Recorder's Office. <br />1) Deed lines of adjoining parcels and right-of-way lines of adjoining roads will be <br />plotted on the Topographic Survey <br />i. This Survey Scope includes the preparation of a Route Survey Plat. <br />4. Phase 2 will use available GIS and LIDAR information for use in the preliminary <br />assessment and design. <br />B. Roadway Design <br />1. Engineering Assessment Report. The CONSULTANT will evaluate existing conditions <br />within the outline Market District Project Area for the purposes of determining proposed <br />alternatives that will address the purpose and need of the project. This will include: <br />a. Evaluate concepts defined in the Farmers Market District Design Study. <br />b. Develop conceptual and typical sections, including number of lanes, drainage <br />requirements, streetscape, accommodations for pedestrians and bicyclists, lighting, and <br />right-of-way limits. All concepts developed will consider design for complete streets. <br />c. Alternate concepts and typical sections will be evaluated based on traffic study results <br />and found environmental constraints. <br />d. Assess utility impacts in relation to proposed typical sections. <br />e. Develop opinion of probable construction cost and preliminary project budget for <br />improvements within the study area <br />f. Provide a summary of findings and recommendations in an Engineering Assessment <br />Report prior to the preliminary Stage 1 design. <br />1) Develop a decision matrix that will outline project sections. Matrix will include <br />opinion of probably costs, project impacts, prioritization rankings, and risk factors. <br />2. Stage 1 Design - The CONSULTANT shall prepare Stage 1, plans and opinions of <br />probable construction cost, which will be in accordance with the accepted standards for <br />such work and in accordance with the following documents in effect at the time the plans <br />Page 7 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />