My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 10:36:35 AM
Creation date
11/29/2023 10:36:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> PAGE 9 OF 11 APPENDIX “A” <br /> Prevention Plan (SWPPP) and compiling of all required documentation for the <br /> permit application. Complete the public notice requirements of the CSGP. <br />9.0 UTILITY COORDINATION <br /> Perform utility coordination for up to twelve (12) utilities in accordance with 105 IAC <br /> 13, IDM Chapter 104, and the INDOT Accommodation Policy. Specific tasks for this <br /> utility coordination include the following: <br /> 9.1 Perform the requirements of IAC 13-3-1, including the identification and <br /> documentation of utility stakeholders within the Project Limits; and prepare and <br /> distribute all required utility correspondence. <br /> 9.2 Prepare and maintain utility coordination records and database. <br /> 9.3 Prepare and send a letter to each affected utility requesting verification of the <br /> information shown in the project plans. <br /> 9.4 Develop and maintain a utility conflict matrix. <br /> 9.5 Prepare and send each utility a set of preliminary plans and request that the utility <br /> identify conflicts with their facilities. Perform conflict analysis and consider <br /> design alternatives to avoid or minimize impacts to utility facilities. <br /> 9.6 Send each utility a set of preliminary final plans and request utility work plans, <br /> assist in the development of the work plans, and review the work plans for the <br /> identified facilities within the project area. <br /> 9.7 Recommend work plans for approval including narrative portion and relocation <br /> drawing. <br /> 9.8 Present all project reports necessary for project delivery such as status reports and <br /> risk reports. <br /> 9.9 Lead or facilitate any meetings involving utility specific activities such as kick-off <br /> meetings, conflict resolution meetings and reimbursement eligibility meetings. <br /> 9.10 Develop a Utility Master Relocation Plan and prepare a Utility Relocation <br /> Schedule if relocations are required. <br /> 9.11 Prepare and sign utility special provisions, utility certification, and all other <br /> required contract letting documents. <br /> 9.12 Conduct post letting coordination services to include tracking utility relocations, <br /> answering utility related questions, and in person or virtual attendance at <br /> construction progress meetings. <br />10.0 PUBLIC INVOLVEMENT <br /> 10.1 Provide design presentation preparation for up to two (2) public meetings. <br /> 10.2 Attend and prepare meeting minutes for up to two (2) public meetings. <br />11.0 TITLE SEARCH <br /> Prepare a documented title search for up to thirty-two (32) parcels covering an interval of <br /> time including one valid transfer of fee title beyond a twenty-year period from the date of <br /> the search. The title search will include all liens (taxes, mortgages, easements, recorded <br /> judgments, etc.) and any encumbrances against the property found to be of record.
The URL can be used to link to this page
Your browser does not support the video tag.