Laserfiche WebLink
Prepare an early coordination letter that will be distributed to consulting <br />parties following approval by INDOT Cultural Resources Office (CRO). <br />7.7.2 Area of Potential Effects (APE) Delineation and Field Inspection - <br />Formulate an APE defining the limits of the survey for aboveground <br />resources. The APE may extend beyond the defined survey limits. A <br />Historian -Section 106 Specialist, who meets the Secretary of the Interior's <br />Professional Qualification Standards as per 36 CFR Part 61, will <br />complete this field inspection. <br />7.7.3 Historic Property Report HPR) - Prepare a HPR that documents the <br />results of the Qualified Professional's survey of aboveground resources. <br />Preparation of the HPR assumes the "Bottling House" located at 739 <br />College Street is a potentially NRHP-eligible property due to its <br />association with the now demolished, but NRHP-listed South Bend <br />Brewing Association Building located across College Street. Assess the <br />building, among others, for inclusion on the NRHP. Submit the HPR to <br />the INDOT CRO for approval, prior to disseminating to the consulting <br />parties. <br />7.7.4 Phase Ia Archaeological Reconnaissance - Review the Phase Ia <br />Archaeological Reconnaissance and coordinate the report findings <br />with INDOT CRO. Review the archaeological report that is prepared prior <br />to submission to INDOT CRO. <br />7.7.5 Preliminary Effects Report Preparation - Prepare a Preliminary Effects <br />Report describing the effect the project will have on historic resources of <br />concern. Submit the report to INDOT for approval prior to distribution to <br />the Section 106 consulting parties. <br />7.7.6 Effects Finding Preparation - Prepare the appropriate level of effects <br />documentation for the project. It is anticipated the project will result in a <br />finding of "No Adverse Effect." Submit the effects documentation to <br />INDOT CRO for approval prior to distribution to consulting parties. <br />Prepare a public notice advertising the opportunity for the public to <br />comment on the effects finding and will include coordinating the <br />publication with the appropriate newspaper. <br />8.0 PERMITTING <br />Prepare the Indiana Department of Environmental Management (IDEM) Construction <br />Stormwater General Permit (CSGP) for this project in accordance with current <br />guidelines. The tasks to be performed include the following: <br />8.1 Manage the permitting tasks to keep the project on schedule and on budget. <br />8.2 Complete the CSGP required for the project, which is expected to impact more <br />than one (1) acre of land. Design erosion and sediment control measures that <br />meet all IDEM and local requirements, preparation of the Storm Water Pollution <br />PAGE 8 OF 11 APPENDIX "A" <br />