<br /> PAGE 5 OF 11 APPENDIX “A” <br /> 5.2 Prepare pedestrian signal modifications at the project intersection including the <br /> following: <br />• Implementation of new pedestrian signal heads, APS push buttons, and <br />signal posts within intersection quadrants, to accommodate the proposed <br />sidewalk and curb ramp modifications required due to the implementation <br />of the Phase 3 Coal Line Trail. <br />• Modification to the existing traffic signal cabinet and controller to <br />accommodate the proposed APS devices. <br />• Miscellaneous conduit, wiring, and signs necessary to complete the <br />intersection improvements. <br />5.3 Review existing topography survey base sheets. <br />5.4 Prepare a Preliminary Field Check traffic signal plan submittal that reflects the <br /> locations of existing traffic signal infrastructure and installation of new traffic <br /> signal infrastructure at the project intersection and submit to LPA for review and <br /> comment. The Preliminary Field Check plans submittal would include the <br /> following: <br />• General plan sheet related elements including plan views; locations of <br />existing utilities, service point, traffic signal equipment and Right-of-Way <br />information. <br />• General notes and equipment legend. <br />• Proposed geometric improvements to the roadway and pedestrian related <br />facilities (sidewalks and curb ramps) at the project intersection. <br />• Conceptual layout of all proposed pedestrian heads, APS push buttons, <br />signal posts, conduits, handholes (if necessary), pavement markings, and <br />pertinent signage. <br />• Number of wires in each cable run. <br />• Phasing diagram <br />• Applicable legend <br />• Provide preliminary project opinion of probable costs related to the <br />proposed traffic signal improvements. <br />5.5 Participate in a Preliminary Field Check meeting with LPA and other project <br /> stakeholders to verify placements of proposed equipment, as well as adequacy of, <br /> or necessary modifications to, the existing service points and any other traffic <br /> signal related infrastructure (e.g., cabinet, controllers, signal poles, etc.). <br />5.6 Revise the Preliminary Field Check plans based on any initial review comments <br /> received from the City, and then submit as Final/Stage 3 traffic signal design <br /> plans to LPA for approval and bidding. Final/Stage 3 plans would include the <br /> following: <br />• Details to clarify desired design elements, if any <br />• Approach names with posted speed identified <br />• Loop Tagging Table <br />• Quantity calculations for each pay item