My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 10:36:35 AM
Creation date
11/29/2023 10:36:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> PAGE 4 OF 11 APPENDIX “A” <br />• General plan sheet related elements including plan views; location of <br />existing utilities, service points, and lighting equipment; Right-of-Way <br />information; proposed conduit/wire type and locations; and all proposed <br />lighting elements. <br />• Provide preliminary project opinion of probable costs related to the <br />proposed lighting improvements. <br />4.5 Participate in a Preliminary Field Check meeting with LPA and other project <br /> stakeholders to verify placements of proposed equipment, as well as adequacy <br /> of, or necessary modifications to, the existing service points. <br />4.6 Revise the Preliminary Field Check plans based on initial review comments <br /> received from LPA, and/or changes recommended based on project site visit, <br /> and then submit as Final/Stage 3 lighting design plans to LPA for approval. <br /> Final/Stage 3 plans would include the following: <br />• Design data details including initial lamp lumens; average maintained <br />illumination; depreciation factors; uniformity ratios; mounting heights; <br />and luminaire classifications. <br />• Development of iso-illuminance or point illuminance exhibits that depict <br />the proposed light levels meet average and avg/min requirements. <br />• The Final/Stage 3 plans will assume the removal of all existing street <br />lighting equipment along the project corridor. <br />• The Final/Stage 3 plans will assume the implementation of new <br />foundations, light poles, LED fixtures, T-bases, conduit, cable duct, and <br />handholes. <br />• The Final/Stage 3 plans will assume INDOT standard foundation and <br />structure designs will be used for all new lighting elements. Provide <br />limited structural analysis to ensure standard INDOT foundations will <br />suffice with the proposed decorative lighting poles. <br />• Completion of wire size and breaker size calculations to each circuit. <br />• Voltage drop calculations <br />• Quantity calculations for each pay item <br />• Final specifications, unique special provisions, and cost estimates relative <br />to the proposed lighting improvements. <br />4.7 Revise the Final/Stage 3 lighting plans per comments received from LPA and <br /> develop construction plans as part of the Final Tracing submittal. <br />5.0 TRAFFIC SIGNAL DESIGN <br /> Perform engineering design services related to modifications of the pedestrian signal <br /> infrastructure at the intersection of US Route 20 (Lincoln Way West) and Wilber Street, <br /> as a result of the implementation of a new Phase 3 Coal Line Trail. <br /> 5.1 Coordinate with LPA staff to verify project goals, equipment preferences, and <br /> overall performance requirements for the proposed traffic signal modernization at <br /> the project intersection.
The URL can be used to link to this page
Your browser does not support the video tag.