Laserfiche WebLink
• Final specifications, unique special provisions, and cost estimates relative <br />to the proposed traffic signal improvements <br />5.7 Revise the Final/Stage 3 traffic signal plans per comments received from LPA, <br />and develop construction plans as part of the Final Tracing submittal. <br />6.0 PROJECT MANAGEMENT <br />6.1 Attend the project scoping meeting with INDOT and LPA. <br />6.2 Prepare and review of INDOT quarterly reports. <br />6.3 Attend quarterly review meetings with LPA as requested. <br />6.4 Preparing monthly project status reports. <br />6.5 Perform general project coordination with LPA and INDOT personnel and other <br />project stakeholders and overall management of the consultant design team for up <br />to (24) months. <br />7.0 ENVIRONMENTAL DOCUMENTATION <br />Perform the following tasks for environmental clearance. <br />7.1 Task Organization/Coordination — Manage and coordinate activities associated <br />with the preparation of the required environmental work. <br />7.2 Client I Subconsultant Contract Coordination — Perform all file management, <br />review of project budget and coordinate subconsultant work. <br />7.3 Identify Property Owners and Mail Notice o Entry for Survey or Investigation <br />Letters — Coordinate with the surveyor to ensure the notices include the <br />appropriate verbiage to cover environmental field activities. <br />7.4 Progress Reports — Assist in the preparation of monthly progress reports to be <br />provided to the client. <br />7.5 Client /Design Coordination Meetings — Prepare for and attend one (1) virtual <br />project kick off meeting and one (1) on site initial field check meeting by one <br />member of the environmental team. <br />7.6 NEPA Documentation — Carry out environmental analyses and develop the <br />appropriate level of National Environmental Policy Act (NEPA) documentation <br />for the project in accordance with INDOT environmental procedures as <br />determined by the anticipated project impacts. A Level 2 Categorical Exclusion <br />(CE-2) is anticipated due to the anticipated Section 106 finding of "No Adverse <br />Effect." It is assumed that acquisition of new permanent plus temporary right-of- <br />way will be less than 0.5-acre. The environmental services required to develop <br />this project shall be in accordance with the Procedural Manual for Preparing <br />Environmental Documents (2008) and the most recent INDOT Categorical <br />Exclusion Manual. The tasks to be performed shall include the following items. <br />7.6.1 Field Inspection — Perform a survey by biologists to document potential <br />environmental resources, recreational facilities, hazardous materials, etc. <br />7.6.2 Red Flag Investigation - Conduct a Red Flag Investigation (RFI) for the <br />project. The RFI will include a preliminary analysis of publicly available <br />PAGE 6 OF 11 APPENDIX "A" <br />