My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 10:36:35 AM
Creation date
11/29/2023 10:36:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> PAGE 3 OF 11 APPENDIX “A” <br /> 3.2 Prepare detailed drainage design for the project, based upon the typical section <br /> that is selected. It is anticipated that drainage from the path will be directed to <br /> existing drainage in the roadway. <br /> 3.3 Prepare a Maintenance of Traffic plan for the project in accordance with the <br /> IMUTCD. <br /> 3.4 Prepare details of non-standard roadway items to be included on detail sheets with <br /> the project plans. <br /> 3.5 Determine the need for Level 1 Design exceptions that will be required during the <br /> project development. If required, necessary documentation to request a formal <br /> Level 1 Design Exception will be completed by the CONSULTANT as part of the <br /> project. <br /> 3.6 Provide the following urban design elements: <br />• Pavers, site furniture, landscape spaces, lighting and signage <br />• Wayfinding signage programming and documentation <br />3.7 Submit required documentation for the Final Tracing Submission to INDOT, with <br /> a copy to LPA. <br />4.0 DECORATIVE LIGHTING DESIGN <br /> Prepare decorative lighting design services related to the implementation of new <br /> decorative street lighting equipment along the proposed Coal Line Trail (Phase 3) in <br /> South Bend, Indiana. The proposed trail is assumed to be implemented along the west <br /> side of College Street, between Linden Avenue and US Route 20 (Lincoln Way West). <br /> The proposed trail is to continue along the south side of US Route 20, between College <br /> Street and Wilber Street. The new decorative street lighting will be generally pedestrian <br /> scale and intended to supplement (not replace) the existing street lighting facilities along <br /> College Street and US Route 20 within the project limits. The existing street light <br /> luminaire arms currently attached to existing power poles will not be removed as a part <br /> of this project. <br /> 4.1 Coordinate with LPA staff to verify project goals, aesthetic lighting preferences, <br /> and overall performance requirements for the proposed lighting facilities. <br /> 4.2 Review existing topography survey base sheets. <br /> 4.3 Develop a lighting model utilizing Acuity Visual software to determine <br /> appropriate light pole locations, meeting average and average: minimum <br /> illumination thresholds. The INDOT design manual and Illuminating Engineering <br /> Society (IES) guidance will be utilized for reference relative to these thresholds <br /> for a trail adjacent to a city street. <br /> 4.4 Prepare a Preliminary Field Check lighting plan submittal that reflects the <br /> locations of existing lighting infrastructure and installation of new lighting <br /> infrastructure within the decorative lighting design project limits and submit to <br /> the LPA for review and comment. The Preliminary Field Check plans submittal <br /> include the following: <br />• Lighting Index and General Note Sheet
The URL can be used to link to this page
Your browser does not support the video tag.