My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:10:11 PM
Creation date
11/28/2023 2:09:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Show annotations
View images
View plain text
Communication Plan Continued <br />PROJECT PHOTOS <br />Bridge 1 Bent 1 headwall <br />Bridge 3 bent 1 headwall <br />Forming bridge 1 bent 2 headwall <br />Rolling stone between bridge 1 and 3 <br />Owner: <br />Day and <br />Date <br />Sun <br />8/29/21 <br />Mon <br />8/30/21 <br />Tues <br />8/31/21 <br />Wed <br />9/1/21 <br />Thurs <br />9/2/21 <br />Fri <br />9/3/21 <br />Sat <br />9/4/21 Prepared by: <br /> <br />Approved <br />Morphey is going to continue forming bridge headwalls and placing final aggregate <br />elevations in advance of paving operations next week <br />This Report: <br />City of Beech Grove Designer:Crossroad Engineers <br />Work in Progress <br />No Work Today <br />Current Controlling <br />Operations <br />Pedestrian Trail Subgrade <br />Reasons for Reporting As a Work Day or <br />Non-Work Day <br />Contractor on-site <br />Pedestrian Trail Subgrade <br />Morphey worked on final Subgrade from bridge 1 <br />to bridge 3 and poured the headwalls fro bridge 3 <br />bent 1 and brige 1 bent 1 <br />Contractor:Morphey Construction <br />Beech Grove Greenway Trail <br />9/4/2021 <br />10/5/2020 <br />Report No.: <br />11/15/2022 <br />Date of Notice to Proceed: <br />For Week Ending: <br />Project Name: <br />5 Total to Date:127 <br />Contract Number: <br />Project Number: <br />Structure Number:Calendar Completion Date: <br />33 <br />Morphey not on-site holiday weekend <br />Paid To Date:1,825,590.00$ <br />Balance Remaining: <br />Work Days Previously Reported:122 3,429,000.00$ Contract Amount: <br />Pedestrian Trail Subgrade <br />Morphey removed froms from bridge 3 bent 1 <br />and bridge 1 bent 1 and formed and formed the <br />headwall from bridge 1 bent 2 <br />Morphey started placing final stone grade <br />between bridge 3 and 1 and formed bridge 2 bent <br />1 headwall <br />Morphey finished forming bridge 2 bent 1 <br />headwall and began placing topsoil on slopes <br />leading to bridge 1 and poured headwall for <br />Morphey placed most of the final grade from <br />bridge 4 to Hornet Ave, finished final stone grade <br />between bridge 3 and bridge 1 and started <br />cc: Contractor <br />Fraction of Day <br />Workable <br />0/24 <br /> 12/24 <br /> 12/24 <br /> 12/24 <br /> 12/24 <br />Contractor not on-site <br />Contractor on-site <br />Contractor on-site <br />Contractor on-site <br />Contractor on-site <br />Pedestrian Trail Subgrade <br />Pedestrian Trail Subgrade <br />Pedestrian Trail Subgrade <br />Pedestrian Trail Subgrade <br />Work Days <br />Charged <br />Jay Niederhauser <br />Construction Manager <br /> WEEKLY REPORT OF CONSTRUCTION ACTIVITES <br />Project Complete Percent: <br />R-39660 <br />1600657 <br />CONTRACTOR ACCEPTANCE <br />Jason Umlauf <br />Project Manager - Morphey Construction <br />Distribution: <br />Original to Owner <br />cc: Project Engineer <br />cc: District File <br />REMARKS / PROJECTED WORK <br />Contractor not-site <br />1,603,410.00$ <br />53% <br />Project Supervisor - United Consulting <br />7-Sep 2021 <br />Jay Niederhauser <br /> 12/24 <br />0/24 <br />0 <br />1 <br />1 <br />1 <br />1 <br />1 <br />0 <br />Page 1 of 1 <br />Keep change orders below 3%Owen will research all claims and <br />provide cost-effective solutions <br />Presents South Bend representatives <br />with solutions instead of problems <br />Quick turnaround on shop drawings <br />and approvals <br />Identify all required documents early <br />on and work with the contractor to <br />deliver submittals ahead of schedule <br />Keeps construction on schedule and <br />eliminates potential construction <br />delays <br />Eliminate construction delays <br />Solve construction related issues at the <br />project level through communication <br />and information sharing <br />Reduces the time City staff has to <br />commit to project-related concerns <br />Protect the project budget Verify all project quantities weekly and <br />discuss at all progress meetings <br />Project representatives will know <br />where the budget stands at all times, <br />empowering South Bend to make <br />informed decisions <br />Coordination with all impacted utilities <br />Owen will assist the contractor with <br />coordination efforts and invite all <br />impacted utility reps to progress <br />meetings <br />Protects the project schedule by <br />making sure conflicts or project <br />impacts are discovered early and <br />resolved quickly <br />PROJECT COST CONTROL GOALS ACHIEVEMENT PROCESS BENEFITS TO THE CITY OF SOUTH BEND <br />Cost Control Plan <br />UNITED CONSULTING CITY OF SOUTH BEND SAFE ROUTES TO SCHOOL AT OUR LADY OF HUNGARY - DES #2100025 (LAPORTE DISTRICT)7 HALL OF FAME
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).