My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:10:11 PM
Creation date
11/28/2023 2:09:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Experience <br />CLIENT: City of Indianapolis DPW <br />PROJECT DESCRIPTION: <br />The project included pedestrian intersection improvements within 1/2 <br />mile of the BRT Redline within the boundaries of Meridian Street from <br />25th St to 38th St, 38th from Meridian St to College Ave, and College <br />Ave from 38th St to 66th St. Major cross street pedestrian improvements <br />include ADA ramp construction, storm water adjustments, and alley and <br />drive transitions at more than 300 ramps. <br />Safe Routes Bike and Pedestrian Facilities <br />CLIENT: City of Beech Grove, Indiana <br />PROJECT DESCRIPTION: <br />This is a new 2.2 mile segment of shared use asphalt path beginning west <br />of Churchman Avenue on Main Street and extending to Emerson Avenue. <br />The majority of the trail follows Lick Creek and crosses the creek at three <br />locations. Also to be constructed as part of the project are four one-span <br />truss bridges. The trail is an important community connector for the city <br />of Beech Grove. <br />A couple of the project challenges included multiple changes in elevation, <br />which required close attention to building ADA compliant access points, <br />coordination with Sarah Bolton Park, coordination with multiple public <br />and private property owners, and working through parking and material <br />delivery challenges, all while constructing multiple pedestrian bridges <br />and trails in a tight urban environment. This project was completed on <br />time and within budget. Successful completion of this project was a <br />catalyst for the next two projects in the City, which will continue the trail, <br />and sidewalk tie-ins connecting the commercial side of Beech Grove with <br />Beech Grove High School and the Hornet Avenue neighborhoods. <br />Beech Grove Greenway, Phase 1 <br />SERVICES PROVIDED BY UNITED: <br /> Construction Inspection <br />SERVICES PROVIDED BY UNITED: <br /> Construction Inspection <br />UNITED CONSULTING CITY OF SOUTH BEND SAFE ROUTES TO SCHOOL AT OUR LADY OF HUNGARY - DES #2100025 (LAPORTE DISTRICT)8 HALL OF FAME
The URL can be used to link to this page
Your browser does not support the video tag.