My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:09:45 PM
Creation date
11/28/2023 2:09:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND | CE SERVICES FOR SAFE ROUTES TO SCHOOL AT OUR LADY OF HUNGARY AMERICAN STRUCTUREPOINT PAGE 7 <br />PROJECT UNDERSTANDINGOUR PATHWAY TO PROGRESS <br />American Structurepoint understands that this is not just a sidewalk project, and our experience will help us stay ahead <br />of issues that may arise due to replacing curb ramps and sidewalks into existing situations. <br />This project improves the pedestrian walking routes to school in the Our <br />Lady of Hungary neighborhood. The neighborhood is made up of mostly <br />residential housing and is bound to the north by Indiana Avenue, Franklin <br />Street to the east, Ewing Avenue to the south and Olive Street to the west. <br />Components of the project will involve the replacement of sidewalk and curb <br />ramps on major walking routes to and from school to improve pedestrian <br />safety and accessibility. <br />Typical maintenance of traffic can consist of shoulder closures to <br />accommodate construction activities while maintaining access to all prop- <br />erties. A pedestrian detour is typically required along with properly placed <br />signage. <br />Coordination with utilities may be necessary due to the construction limits for <br />the replacement of the curb ramps at various intersections. Our experience <br />has seen the need for either utility pole relocation or holding an existing pole. <br />We will review utility work plans and coordinate early and often to maintain <br />the schedule. <br />CONTRACT R-44114 is currently scheduled for an INDOT letting on <br />March 12, 2025. American Structurepoint has visited the site, and we are <br />excited to have the opportunity to submit this proposal. We look forward <br />to delivering a high-quality project and improving the the quality of life <br />for the residents who walk this neighborhood daily. <br />Damaged and deteriorated sidewalk to be replaced
The URL can be used to link to this page
Your browser does not support the video tag.