Laserfiche WebLink
BRAUN <br />RODGERS, PE <br />FIELD OPERATIONS MANAGER <br />EDUCATION <br />BS, CIVIL ENGINEERING <br />Purdue University <br />CERTIFICATIONS <br />PROFESSIONAL ENGINEER <br />Indiana; PE11600321 <br />ADDITIONAL CERTIFICATIONS: <br /> INDOT Certified Technician Program - <br />Certified in All Areas <br /> INDOT Quality Assurance Certified <br /> INDOT Certified Bridge Inspection <br />Team Leader <br /> Indiana Water Environmental <br />Association - Water and Sewer Course <br /> OSHA Confined Space Entry Course <br /> INDOT Site Manager Proficiency <br /> INDOT Storm Water Management <br />Training <br /> CIP Training <br /> ACEC DPW RPR Workshop <br />EXPERIENCE <br />9+ YEARS <br />CONTACT <br />O: (317) 895-2585 <br />M: (812) 677-0674 <br />E: braun.rodgers@ucindy.com <br />Braun will provide project oversight on this project, providing an element of quality control and <br />familiarity throughout the duration of the construction process. His experience will allow him to <br />identify project issues before they become problems, and communicate timely recommendations <br />for cost-effective solutions. <br />UNIQUE PROJECT EXPERIENCE <br />MONON TRAIL OVER SR 32; <br />WESTFIELD, INDIANA <br />Field Operations Manager: This federal- <br />aid bridge was designed and inspected <br />by United to consistently maintain the <br />aesthetic value and match the appearance <br />of the two neighboring Monon Trail bridges <br />located over Carmel Drive and 146th Street. <br />The structure is a five-span painted <br />prefabricated steel truss structure with one span at 65 feet and four spans at 120 feet. Upon <br />completion of this SR 32 project, the main span for the new structure was 176 feet long. <br />Retaining walls were required along the Monon Trail to provide adequate vertical clearance over <br />SR 32 and Tournament Trail Drive while staying within existing right-of-way and avoiding various <br />utilities. The trail connects vital portions of Westfield, including many shops and restaurants at <br />SR 32 with Grand Park Sports Campus. <br />MONON OVER SR 32 <br />COUNTY ROAD 100 S RECONSTRUCTION AVON, INDIANA <br />Field Operations Manager: CR 100 S was <br />a two-mile stretch from Dan Jones Road to <br />Ronald Reagan Parkway that added two <br />additional travel lanes with a boulevard <br />style center median. The bridge over <br />Clark’s Creek was replaced with a new arch <br />structure. Roundabouts were constructed <br />at Salt Lake Road, CR 900 E, and All Points <br />Court to provide access to the current and <br />future developments along the corridor. <br />The reconstruction started off in February <br />with Duke Energy’s transmission line guy <br />wire in conflict with the proposed sanitary <br />sewer. The team was able to redesign, obtain <br />WCCD approval, receive IDEM installation <br />permits, and obtain new sanitary sewer <br />manholes while only incurring a 43-calendar <br />day delay. This would be a devastating delay <br />for most projects, but the Avon/United team <br />had pushed the utility companies along and <br />all relocation work was completed months <br />ahead of schedule. This allowed United <br />to recommend an alternative maintenance <br />of traffic phasing, which not only provided <br />a better end product, but also allowed the <br />roadway to be opened to <br />traffic in 2021. <br />UNITED CONSULTING  CITY OF SOUTH BEND  SAFE ROUTES TO SCHOOL AT MUESSEL PRIMARY/HOLY CROSS SCHOOL - DES #1900447 (LAPORTE DISTRICT)4 HALL OF FAME