Laserfiche WebLink
Project Approach <br />The project is currently scheduled to let August of 2024. We anticipate a Notice -to -Proceed to be issued in September of 2024 for construction. <br />No plans were available for review at the time the LOI was prepared. It is our understanding the project includes the replacement of pedestrian <br />sidewalks and ADA ramps around both Muessel Primary School and Holy Cross School (see map below for impacted areas). The project area has <br />several ramps and sidewalk crossings that do not meet current ADA standards. <br />From our review of the site and familiarity of sidewalk and ramp replacement projects, we expect a high level of coordination effort to be required <br />throughout the project with the impacted schools, as well as the South Bend Public Information Officer. Keeping all impacted parties up to date with <br />the current areas of sidewalk closures will be important to maintain safe pedestrian travel throughout the project duration. <br />PROJECT <br />AREA <br />r , <br />J <br />4 � <br />BEST <br />PLACES <br />TO WORK IN <br />DIANA <br />UNITED CONSULTING ■ CITY OF SOUTH BEND III SAFE ROUTES TO SCHOOL AT MUESSEL PRIMARY/HOLY CROSS SCHOOL - DES #1900447 (LAPORTE DISTRICT) , �N <br />i <br />