Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - DLZ
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - DLZ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:09:07 PM
Creation date
11/28/2023 2:08:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wrenwood Trail » North Liberty, Indiana <br />DLZ provided construction engineering services for the construction of a <br />new asphalt trail from North Liberty School to the Potato Creek Crossing <br />Subdivision. A new 70’-2” Pre-Engineered Steel Truss Bridge was <br />constructed over Potato Creek. The bridge consisted of steel piling, concrete <br />end bents and reinforced concrete bridge approaches. Construction of <br />the project also included subgrade treatment, compacted aggregate, curb <br />ramp, and landscaping. Coordination for the project included maintenance of <br />traffic, staging of construction, construction schedule, and material testing. <br />LaSalle Trail, Phase III » St. Joseph County, Indiana <br />DLZ provided construction engineering services for the extension of the LaSalle Trail shared use path from Auten Road to the <br />Indiana/Michigan State Line. Work included construction of ADA compliant infrastructure with trail being 10 feet wide and hard- <br />surfaced concrete pavement with 2-foot shoulders. The length of the path is 5,700 feet. <br />The path follows the alignment on the existing former railroad bed and aligns with the trail from the previous phase, LaSalle Trail <br />Phase II. Coordination was required to align the path from the south side of State Line Road to the north side with the existing <br />IN-MI River Valley Trail. <br />City of South Bend » Safe Routes to School » Construction Inspection 10
The URL can be used to link to this page
Your browser does not support the video tag.