My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - DLZ
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - DLZ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:09:07 PM
Creation date
11/28/2023 2:08:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9City of South Bend » Safe Routes to School » Construction Inspection <br />Monroe Primary/Studebaker <br />Elementary SRTS » South Bend, <br />Indiana <br />DLZ provided project management, construction inspection, <br />and administration services to replace over 4,500 <br />square yards of concrete sidewalk and curb ramps at <br />approximately 100 intersections in the City of South Bend. <br /> <br />This project included replacing selected sections of <br />sidewalk and curb ramps within the general areas of <br />Monroe Primary Center and Studebaker Elementary School. <br />Significant field coordination was necessary to adjust <br />the concrete removal limits to maximize the sidewalk <br />replacement and control the project quantities. Grades <br />and elevations of the newly constructed elements were <br />monitored to confirm they met current ADA standards. <br />Nearly 5,800 linear feet of curb was replaced throughout <br />this project to allow for proper construction of the new curb <br />ramps. <br />Stellar Trail » North Liberty, Indiana <br />Construction engineering services were provided for the construction of a new 4,600-foot asphalt trail that connects Tamarack <br />Trail to School Trail. A 400-foot boardwalk was constructed along an existing wetland area just east of North Liberty School. <br />The boardwalk consisted of helical piles, concrete end bents, and treated lumber. Construction of the project also included <br />subgrade treatment, compacted aggregate, and seeding. Coordination for the project included maintenance of traffic, staging of <br />construction, construction schedule, and material testing. <br />EXPERIENCE
The URL can be used to link to this page
Your browser does not support the video tag.