My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - DLZ
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - DLZ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:09:07 PM
Creation date
11/28/2023 2:08:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11City of South Bend » Safe Routes to School » Construction Inspection <br />R-34699 Safe Routes to School <br />Project » Mishawaka, Indiana <br />INDOT Contract R-34699, was a Safe Routes to School <br />project in Mishawaka, Indiana. Curb ramps and sidewalks <br />along various streets near Battell Elementary School were <br />upgraded per current ADA requirements. Several streets <br />within the project limits had very steep grades, which <br />required additional construction engineering and field <br />adjustments to be made. Besides coordinating with local <br />residents and businesses, additional coordination was <br />performed so the project would not interfere with school. <br />Tamarack Trail » North Liberty, Indiana <br />DLZ provided construction administration services to construct a new 4,600-foot asphalt trail from Quinn Road to Wabash <br />Avenue. The trail connects the North Liberty Community Center to the North Liberty Youth League Ballpark along the <br />abandoned railroad corridor (formerly Indiana, Illinois, and Iowa Railroad). Approximately 2,200 feet of woods were cleared <br />as part of the project. Construction of the project also included subgrade treatment, compacted aggregate, and seeding. <br />Coordination for the project included maintenance of traffic, staging of construction, construction schedule, and material <br />testing.
The URL can be used to link to this page
Your browser does not support the video tag.