My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Marion Street Pedestrian Bridge Proj No. 123-060 – Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Marion Street Pedestrian Bridge Proj No. 123-060 – Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:23:00 PM
Creation date
11/14/2023 2:22:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 11 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />• Prepare an opinion of probable construction cost for each of the alternatives. <br />• Prepare memo with assumptions and analysis results. <br />2. All design phases of the project will be developed on the basis that the project will be <br />funded with 100% local funds. Design changes due to alternate funding for the project <br />shall be considered Additional Services. <br />A1.03 HYDRAULICS AND SCOUR ANALYSIS <br />1. The drainage area of St. Joseph River is greater than 50 square miles at the project site. <br />Therefore, the completion of hydraulic services in preparation of a Construction in a <br />Floodway (CIF) Permit from the Indiana Department of Natural Resources (IDNR) will be <br />necessary. The hydraulic services for this project will consist of the hydrologic, hydraulic <br />and scour computations necessary to provide an appropriate hydraulic opening for the <br />pedestrian bridge preferred conceptual design alternative identified with this Alternatives <br />Analysis. Hydraulic modeling will be completed as required by the INDOT Design <br />Manual, IDNR and Porter County. An FIS hydraulic model and CIF Permit models exist <br />for this site. <br /> <br />2. Hydraulic modeling tasks shall include the following: <br /> <br />a. Drainage area determination by Stream Stats and collection of other needed <br />background data <br />b. Determination of Q100 discharge from IDNR “Indiana Peak Discharge Determination <br />System” <br />c. Prepare Natural Conditions hydraulic model <br />d. Prepare Corrected Effective hydraulic model <br />e. Prepare Existing Conditions hydraulic model <br />f. Prepare Proposed Conditions hydraulic model <br />g. Prepare IDNR Hydraulic Modeling Checklist in support of CIF Permit Application. <br />h. Perform scour computations <br />i. Design scour countermeasures <br />j. Prepare hydraulic report
The URL can be used to link to this page
Your browser does not support the video tag.